|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2025 Measured TD: 8100 ft. Vertical TD: 7902 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/9/2012 | | Proposed Top PZ Location: | Sec:1 Twp: 4N 67W | Footage: 2720 FNL 1470 FWL | | Bottom Hole Location: | Sec:1 Twp: 4N 67W | Footage: 2720 FNL 1470 FWL | | Proposed Depth/Form: | 8121 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: S2NW4, N2SW4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: S2NW4, N2SW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8121 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8121 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/28/2010 | | Spud Date: | 5/24/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8100 ft. | Measured PB depth: | 8054 ft. | | True Vertical TD: | 7902 ft. | True Vertical PB depth: | 7856 ft. | | Top PZ Location: | Sec:1 Twp: 4N 67W | Footage: 2733 FNL 1481 FWL | | Bottom Hole Location: | Sec:1 Twp: 4N 67W | Footage: 2721 FNL 1478 FWL | | Log Types: | | | Log Types: | PE/AILC-CNLD-ML, GR-CCL-CB-VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 884 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 884 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8091 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 985, Top: 753 ft., Bottom: 8091 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2705 ft. | | | | | PARKMAN | 3806 ft. | | | | | SUSSEX | 4395 ft. | | | | | SHANNON | 4910 ft. | | | | | NIOBRARA | 7173 ft. | | | | | FORT HAYS | 7488 ft. | | | | | CODELL | 7508 ft. | | | | | J SAND | 7944 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 9/1/2025 Interval Top: 7960 ft. Interval Bottom: 8006 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/22/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/19/2010 | | Treatment Summary: | Frac JSND w/ 177,160 gal SW & 160,760# 40/70 sand & 4,000# 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/3/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1273 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 6900 | | CALC_MCF_GAS | 138 | | CASING_PRESS | 2750 | | GRAVITY_OIL | 56 | | MCF_GAS | 138 |
| | Perforation Data: | | Interval Top: | 7960 ft. | # Of Holes: | 96 | | Interval Bottom: | 8006 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 9/1/2025 Interval Top: 7182 ft. Interval Bottom: 7530 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/22/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/22/2010 | | Treatment Summary: | NBRR Perf 7182-7386 Holes 62 Size 0.42 CODL Perf 7510-7530 Holes 60 Size 0.38
Frac NBRR w/ 250 gal 15% HCl & 246,131 gal SW & 204,000# 40/70 sand & 4,000# SB Excel.
Frac CODL w/ 250 gal 15% HCl & 202,028 gal SW & 150,000# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/3/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1273 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 6900 | | CALC_MCF_GAS | 138 | | CASING_PRESS | 2750 | | GRAVITY_OIL | 56 | | MCF_GAS | 138 |
| | Perforation Data: | | Interval Top: | 7182 ft. | # Of Holes: | 122 | | Interval Bottom: | 7530 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 309 |
| Total Gas Produced (MCF) | 6011 |
| GOR | 19453 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.667 |
| Average MCFE per Day | 21.263 |
| Federal Financial Assurance | i | |
|
|