|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/5/2019 Measured TD: 8595 ft. Vertical TD: 8240 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/5/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/9/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 39 FSL 2485 FWL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 33 FSL 2464 FWL | | Proposed Depth/Form: | 8663 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8663 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8663 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/5/2010 | | Spud Date: | 6/30/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8595 ft. | Measured PB depth: | 8544 ft. | | True Vertical TD: | 8240 ft. | True Vertical PB depth: | 8189 ft. | | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 39 FSL 2485 FWL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 33 FSL 2464 FWL | | Log Types: | Preliminary Form 5 | | Log Types: | GR-CCL-CB-VDL; PE/CD-CN-ML, DI-GL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1027 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 0 ft., Bottom: 1027 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8579 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 770, Top: 1450 ft., Bottom: 8579 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8579 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 770, Top: 1450 ft., Bottom: 8579 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4505 ft. | | | | | SUSSEX | 5004 ft. | | | | | NIOBRARA | 7685 ft. | | | | | FORT HAYS | 8016 ft. | | | | | CODELL | 8039 ft. | | | | | J SAND | 8473 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/5/2019 Interval Top: 8482 ft. Interval Bottom: 8508 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/20/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/23/2010 | | Treatment Summary: | Frac JSND w/ 147,882 gal SW & 119,060# 40/70 sand & 4,000# Super LC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1135 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 8482 ft. | # Of Holes: | 52 | | Interval Bottom: | 8508 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/5/2019 Interval Top: 7808 ft. Interval Bottom: 8060 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/20/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/31/2010 | | Treatment Summary: | NBRR Perf 7808-7910 Holes 66 Size 0.47 CODL Perf 8042-8060 Holes 54 Size 0.42
Frac NBRR w/ 250 gal 15% HCl & 242,132 gal SW & 201,580# 30/50 sand & 4,000# SuperLC.
Frac CODL w/ 201,726 gal SW & 150,560# 30/50 sand & 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | BTU_GAS | 1135 | | CALC_BBLS_OIL | 5 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7808 ft. | # Of Holes: | 120 | | Interval Bottom: | 8060 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/05/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|