|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/5/2025 Measured TD: 7909 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/5/2025 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 3/3/2012 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24# , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8000 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 732, Top: , Bottom: 8000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/26/2012 | | Spud Date: | 2/22/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7909 ft. | Measured PB depth: | 7851 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, Triple Combo | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 859 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 313, Top: 0 ft., Bottom: 859 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7897 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 1305 ft., Bottom: 7897 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1210 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 176, Top: 164 ft., Bottom: 1210 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 652 ft. | | | | | PARKMAN | 3875 ft. | | | | | SUSSEX | 4485 ft. | | | | | SHANNON | 5309 ft. | | | | | NIOBRARA | 6960 ft. | | | | | FORT HAYS | 7232 ft. | | | | | CODELL | 7254 ft. | | | | | MOWRY | 7697 ft. | | | | | J SAND | 7713 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 5/5/2025 Interval Top: 7722 ft. Interval Bottom: 7760 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2012 | | Treatment Summary: | Pumped 258,066 lbs of Ottawa Proppant, 16,708 lbs of Super LC Proppant and 142,800 gallons of Vistar.
The J-Sand is producing through a composite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7722 ft. | # Of Holes: | 96 | | Interval Bottom: | 7760 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/24/2024 Interval Top: 7255 ft. Interval Bottom: 7271 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/12/2012 | | Treatment Summary: | Pumped 253,885 lbs of Ottawa Proppant and 113,400 gallons of 15% HCL, Slick Water, and Vistar.
The Codell is producing through a composite flow through plug.
Commingle the Niobrara and Codell.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7255 ft. | # Of Holes: | 48 | | Interval Bottom: | 7271 ft. | Hole Size: | 0.43 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/24/2024 Interval Top: 7025 ft. Interval Bottom: 7760 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 65 | | BTU_GAS | 1237 | | CALC_BBLS_H2O | 23 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 4846 | | CALC_MCF_GAS | 315 | | CASING_PRESS | 575 | | GRAVITY_OIL | 53 | | MCF_GAS | 315 |
| | Perforation Data: | | Interval Top: | 7025 ft. | # Of Holes: | 192 | | Interval Bottom: | 7760 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/5/2025 Interval Top: 7025 ft. Interval Bottom: 7271 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7025 ft. | # Of Holes: | 96 | | Interval Bottom: | 7271 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/24/2024 Interval Top: 7025 ft. Interval Bottom: 7137 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/12/2012 | | Treatment Summary: | Pumped 237,619 lbs of Ottawa Proppant and 153,468 gallons of Slick Water and Silverstim.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7025 ft. | # Of Holes: | 48 | | Interval Bottom: | 7137 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/05/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|