|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/27/2020 Measured TD: 8426 ft. Vertical TD: 8301 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/27/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/10/2012 | Proposed Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 71 FSL 1329 FEL | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 66 FSL 1365 FEL | Proposed Depth/Form: | 8432 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8432 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8432 ft. |
| | |
Wellbore Completed | Completion Date: | 7/4/2010 | Spud Date: | 6/30/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8426 ft. | Measured PB depth: | 8380 ft. | True Vertical TD: | 8301 ft. | True Vertical PB depth: | 8255 ft. | Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 71 FSL 1329 FEL | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 66 S 1365 E | Log Types: | Preliminary Form 5 | Log Types: | PE/CNLD, AILC, ML, CV; CB-GR-CCL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1005 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 630, Top: 0 ft., Bottom: 1005 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8426 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 4430 ft., Bottom: 8426 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4352 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 998, Top: 1420 ft., Bottom: 4358 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4360 ft. | | | | SUSSEX | 4792 ft. | | | | NIOBRARA | 7508 ft. | | | | FORT HAYS | 7824 ft. | | | | CODELL | 7845 ft. | | | | J SAND | 8287 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/27/2020 Interval Top: 8298 ft. Interval Bottom: 8326 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/30/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/16/2010 | Treatment Summary: | Frac JSND w/ 147,000 gal SW & 115,780# 40/70 sand & 4,020# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/24/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 30 | BTU_GAS | 1153 | CALC_BBLS_OIL | 30 | CALC_GOR | 2967 | CALC_MCF_GAS | 89 | CASING_PRESS | 600 | GRAVITY_OIL | 48 | MCF_GAS | 89 |
| Perforation Data: | Interval Top: | 8298 ft. | # Of Holes: | 58 | Interval Bottom: | 8326 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/27/2020 Interval Top: 7498 ft. Interval Bottom: 7864 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/30/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/19/2010 | Treatment Summary: | NBRR Perf 7498-7720 Holes 78 Size 0.42 CODL Perf 7848-7864 Holes 64 Size 0.38
Frac NBRR w/ 252 gal 15% HCl & 253,676 gal SW & 201,380# 40/70 sand & 4,040# SB Excel.
Frac CODL w/ 207,001 gal SW & 150,600# 40/70 sand & 4,060# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/24/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 30 | BTU_GAS | 1153 | CALC_BBLS_OIL | 30 | CALC_GOR | 2967 | CALC_MCF_GAS | 89 | CASING_PRESS | 600 | GRAVITY_OIL | 48 | MCF_GAS | 89 |
| Perforation Data: | Interval Top: | 7498 ft. | # Of Holes: | 142 | Interval Bottom: | 7864 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 02/27/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|