|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/27/2020 Measured TD: 8500 ft. Vertical TD: 8321 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/27/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/10/2012 | Proposed Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 1329 FSL 2592 FWL | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 1328 FSL 2607 FWL | Proposed Depth/Form: | 8487 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: E/2SW/4, W/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8487 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8487 ft. |
| | |
Wellbore Completed | Completion Date: | 6/19/2010 | Spud Date: | 6/15/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8500 ft. | Measured PB depth: | 5961 ft. | True Vertical TD: | 8321 ft. | True Vertical PB depth: | 5782 ft. | Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 1329 FSL 2592 FWL | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 1328 S 2607 W | Log Types: | | Log Types: | PE/CNLD, AILC, ML, CAL, TCOM; GR-CCL-CB-VDL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1016 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1016 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8491 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 190, Top: 7415 ft., Bottom: 8491 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5901 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 1580 ft., Bottom: 5961 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4310 ft. | | | | SUSSEX | 4739 ft. | | | | SHANNON | 5367 ft. | | | | NIOBRARA | 7581 ft. | | | | FORT HAYS | 7897 ft. | | | | CODELL | 7919 ft. | | | | J SAND | 8348 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/27/2020 Interval Top: 8363 ft. Interval Bottom: 8393 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/30/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/16/2010 | Treatment Summary: | Frac JSND w/ 144,690 gal SW & 115,040# 40/70 sand & 4,180# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/13/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 3 | BTU_GAS | 1153 | CALC_BBLS_OIL | 3 | CALC_GOR | 5334 | CALC_MCF_GAS | 16 | CASING_PRESS | 550 | GRAVITY_OIL | 48 | MCF_GAS | 16 |
| Perforation Data: | Interval Top: | 8363 ft. | # Of Holes: | 58 | Interval Bottom: | 8393 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/27/2020 Interval Top: 7576 ft. Interval Bottom: 7933 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/30/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/16/2010 | Treatment Summary: | NBRR Perf 7576-7784 Holes 62 Size 0.42 CODL Perf 7921-7933 Holes 60 Size 0.38
Frac NBRR w/ 250 gal 15% HCl & 240,492 gal SW & 201,180# 40/70 sand & 4,040# 20/40 SB Excel.
Frac CODL w/ 207,690 gal SW & 151,880# 40/70 sand & 4,280# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/13/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 3 | BTU_GAS | 1153 | CALC_BBLS_OIL | 3 | CALC_GOR | 5334 | CALC_MCF_GAS | 16 | CASING_PRESS | 550 | GRAVITY_OIL | 48 | MCF_GAS | 16 |
| Perforation Data: | Interval Top: | 7576 ft. | # Of Holes: | 122 | Interval Bottom: | 7933 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 02/27/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|