|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/5/2018 Measured TD: 8565 ft. Vertical TD: 8362 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/5/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/27/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 1400 FSL 2480 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 1400 FSL 2480 FEL | | Proposed Depth/Form: | 8523 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: E/2SW4 & W/2SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: E/2SW4 & W/2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8523 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 7394 ft., Bottom: 8523 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/17/2011 | | Spud Date: | 4/13/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8565 ft. | Measured PB depth: | 8520 ft. | | True Vertical TD: | 8362 ft. | True Vertical PB depth: | 8317 ft. | | Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 1403 FSL 2470 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 1415 FSL 2457 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1055 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 460, Top: 0 ft., Bottom: 1055 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8550 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 4080 ft., Bottom: 8550 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4696 ft. | | | | | NIOBRARA | 7652 ft. | | | | | CODELL | 7990 ft. | | | | | J SAND & SHANNON | 8416 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/29/2019 Interval Top: 8428 ft. Interval Bottom: 8446 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/6/2011 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J-SAND 8428'-8446', (36 HOLES) W/ 153,859 GAL 18# VISTAR HYBRID CROSS LINKED GAL CONTAINING 254,377# 20/40 SAND. 06-06-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8428 ft. | # Of Holes: | 36 | | Interval Bottom: | 8446 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/30/2011 Interval Top: 7740 ft. Interval Bottom: 8446 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/30/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP @ 7600'. 06-26-11. DRILLED OUT CBP @ 7600'. CFP @ 7850' AND 8100' TO COMMINGLE THE JSND-CDL-NBRR. 06-28-11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8415 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 44 | | BBLS_OIL | 42 | | BTU_GAS | 1175 | | CALC_BBLS_H2O | 44 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 2381 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1841 | | GRAVITY_OIL | 49 | | MCF_GAS | 100 | | TUBING_PRESS | 756 |
| | Perforation Data: | | Interval Top: | 7740 ft. | # Of Holes: | 156 | | Interval Bottom: | 8446 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/29/2019 Interval Top: 7740 ft. Interval Bottom: 8010 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/9/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8100'. 06-08-11. FRAC'D THE CODELL 7990'-8010' (40 HOLES) W/ 108,318 GAL 23# VISTAR HYBRID CROSSED LINKED GEL CONTAINING 251,801# 20/40 SAND. 06-09-11
SET CFP @ 7850'. 06-09-11. FRAC'D THE NIOBRARA 7740'-7760' (80 HOLES), W/ 125,832 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 225,402# 20/40 SAND 06-09-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7740 ft. | # Of Holes: | 120 | | Interval Bottom: | 8010 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/29/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|