|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/2/2018 Measured TD: 8585 ft. Vertical TD: 8405 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/27/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 104 FSL 64 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 103 FSL 53 FEL | | Proposed Depth/Form: | 8541 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8541 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 7406 ft., Bottom: 8541 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/23/2011 | | Spud Date: | 4/19/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8585 ft. | Measured PB depth: | 8534 ft. | | True Vertical TD: | 8405 ft. | True Vertical PB depth: | 8354 ft. | | Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 104 FSL 64 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 103 FSL 53 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1055 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1055 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8572 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 3240 ft., Bottom: 8572 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2750 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 2732 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4610 ft. | | | | | NIOBRARA | 7626 ft. | | | | | CODELL | 7972 ft. | | | | | J SAND & SHANNON | 8408 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/2/2018 Interval Top: 8417 ft. Interval Bottom: 8430 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/6/2011 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J SAND 8417'-8430' (26 HOLES WITH 192,312 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 249,113# 20/40 SAND. 06-06-11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8417 ft. | # Of Holes: | 26 | | Interval Bottom: | 8430 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/1/2011 Interval Top: 7732 ft. Interval Bottom: 8430 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/1/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP @ 7690'. 06-24-11. DRILLED OUT CBP @ 7690'. CFP @ 7850' AND 8100' TO COMMINGLE THE JSND-CDL-NBRR. 06-25-11 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8405 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 21 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 11143 | | CALC_MCF_GAS | 234 | | CASING_PRESS | 1684 | | MCF_GAS | 234 | | TUBING_PRESS | 806 |
| | Perforation Data: | | Interval Top: | 7732 ft. | # Of Holes: | 138 | | Interval Bottom: | 8430 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/2/2018 Interval Top: 7732 ft. Interval Bottom: 7992 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/10/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8100'. 06-09-11. FRAC'D THE CDL 7972'- 7992' (40HOLES) W/ 112,963 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,077# 20/40 SAND 06-10-11
SET CFP @ 7850' 06-10-11.
FRAC'D THE NBRR 7732' - 7750' (72 HOLES), W/ 135,114 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 258,972# 20/40 SAND. 06-10-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7732 ft. | # Of Holes: | 112 | | Interval Bottom: | 7992 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/02/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|