|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2022 Measured TD: 8052 ft. Vertical TD: 7896 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 2/25/2012 | Prop Depth/Form: | 8022 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: 5: W2NW 6: E2NE | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: 5: W2NW 6: E2NE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 455, Top: , Bottom: 650 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8022 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8022 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 7/1/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8052 ft. | Measured PB depth: | 8004 ft. | True Vertical TD: | 7896 ft. | True Vertical PB depth: | 7848 ft. | Top PZ Location: | Sec:5 Twp: 2N 67W | Footage: 1460 FNL 32 FWL | Depth | Bottom Hole Location: | Sec:5 Twp: 2N 67W | Footage: 1456 FNL 24 FWL | Depth | Log Types: | PRELIMINARY FORM 5 | Log Types: | DI-GL-GR, CD-CN-ML, CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 681 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 470, Top: 0 ft., Bottom: 681 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8042 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1167, Top: 1118 ft., Bottom: 8042 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1089 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 95, Top: 618 ft., Bottom: 1080 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3848 ft. | | | | SUSSEX | 4282 ft. | | | | SHANNON | 4826 ft. | | | | NIOBRARA | 7201 ft. | | | | FORT HAYS | 7436 ft. | | | | CODELL | 7456 ft. | | | | J SAND | 7895 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 4/1/2022 Interval Top: 7902 ft. Interval Bottom: 7932 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/27/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 8/9/2010 | Treatment Summary: | J Sand Perfs: 7902-7932 Holes: 60 Size: .38
Frac J Sand w/ 148,526 gal Slickwater w/ 116,000# 40/70 sand, 4,000# SB Excel sand |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8052 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/3/2010 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 64 | BTU_GAS | 1271 | CALC_BBLS_OIL | 64 | CALC_GOR | 4219 | CALC_MCF_GAS | 270 | CASING_PRESS | 1100 | GRAVITY_OIL | 49 | MCF_GAS | 270 |
| Perforation Data: | Interval Top: | 7902 ft. | # Of Holes: | 60 | Interval Bottom: | 7932 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2020 Interval Top: 7250 ft. Interval Bottom: 7477 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/16/2010 | Treatment Summary: | NB Perfs: 7250-7334 Holes: 66 Size: .42 CD Perfs: 7459-7477 Holes: 54 Size: .38
Frac NB w/ 250 gal 15% HCl & 244,694 gal SW w/ 200,280# 40/70 sand, 4,000# SuperLC sand
Frac CD w/ 226,968 gal SW w/ 150,400# 40/70 sand, 4,000# SuperLC sand |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/22/2010 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 76 | BTU_GAS | 1271 | CALC_BBLS_OIL | 76 | CALC_GOR | 3474 | CALC_MCF_GAS | 264 | CASING_PRESS | 1100 | GRAVITY_OIL | 49 | MCF_GAS | 264 |
| Perforation Data: | Interval Top: | 7250 ft. | # Of Holes: | 120 | Interval Bottom: | 7477 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|