|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/23/2025 Measured TD: 8050 ft. Vertical TD: 7922 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/23/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/9/2012 | | Proposed Top PZ Location: | Sec:36 Twp: 5N 67W | Footage: 2550 FNL 1360 FWL | | Bottom Hole Location: | Sec:36 Twp: 5N 67W | Footage: 2550 FNL 1360 FWL | | Proposed Depth/Form: | 8018 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: S/2NW4, N/2SW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8018 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8018 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/26/2010 | | Spud Date: | 6/22/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8050 ft. | Measured PB depth: | 7996 ft. | | True Vertical TD: | 7922 ft. | True Vertical PB depth: | 7868 ft. | | Top PZ Location: | Sec:36 Twp: 5N 67W | Footage: 2557 FNL 1339 FWL | | Bottom Hole Location: | Sec:36 Twp: 5N 67W | Footage: 2560 FNL 1335 FWL | | Log Types: | | | Log Types: | PE/CNLD, AILC, ML, CLCV, TCOM; GR-CCL-CB-VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 883 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 883 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8035 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 783 ft., Bottom: 8035 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3775 ft. | | | | | SUSSEX | 4470 ft. | | | | | SHANNON | 4881 ft. | | | | | NIOBRARA | 7120 ft. | | | | | FORT HAYS | 7420 ft. | | | | | CODELL | 7443 ft. | | | | | J SAND | 7902 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/23/2025 Interval Top: 7918 ft. Interval Bottom: 7952 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/30/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/26/2010 | | Treatment Summary: | Frac JSND w/ 172,040 gal SW & 160,240# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/17/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 15 | | BTU_GAS | 1289 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 15133 | | CALC_MCF_GAS | 227 | | CASING_PRESS | 2850 | | GRAVITY_OIL | 56 | | MCF_GAS | 227 |
| | Perforation Data: | | Interval Top: | 7918 ft. | # Of Holes: | 66 | | Interval Bottom: | 7952 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/23/2025 Interval Top: 7124 ft. Interval Bottom: 7466 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/30/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/30/2010 | | Treatment Summary: | NBRR Perf 7124-7326 Holes 62 Size 0.42 CODL Perf 7444-7466 Holes 66 Size 0.38
Frac NBRR w/ 250 gal 15% HCl & 261,631 gal SW & 201,220# 40/70 sand & 4,000# SB Excel.
Frac CODL w/ 205,338 gal SW & 150,100# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/17/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 16 | | BTU_GAS | 1289 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 14250 | | CALC_MCF_GAS | 228 | | CASING_PRESS | 2850 | | GRAVITY_OIL | 56 | | MCF_GAS | 228 |
| | Perforation Data: | | Interval Top: | 7124 ft. | # Of Holes: | 128 | | Interval Bottom: | 7466 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/23/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 194 |
| Total Gas Produced (MCF) | 3307 |
| GOR | 17046 |
| GOR Determination | MCFE |
| Average BOE per Day | 1.953 |
| Average MCFE per Day | 11.363 |
| Federal Financial Assurance | i | |
|
|