|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/26/2024 Measured TD: 8112 ft. Vertical TD: 7974 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/26/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 2/6/2012 | Proposed Top PZ Location: | Sec:25 Twp: 3N 67 | Footage: 1296 FNL 80 FEL | Bottom Hole Location: | Sec:25 Twp: 3N 67 | Footage: 1298 FNL 80 FEL | Proposed Depth/Form: | 8013 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA-SEE COMMENTS | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 540 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 228, Top: 0 ft., Bottom: 540 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8013 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 520, Top: , Bottom: 8013 ft. |
| | |
Wellbore Completed | Completion Date: | 11/12/2010 | Spud Date: | 11/9/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8112 ft. | Measured PB depth: | 8058 ft. | True Vertical TD: | 7974 ft. | True Vertical PB depth: | 7920 ft. | Top PZ Location: | Sec:25 Twp: 3N 67 | Footage: 1296 FNL 80 FEL | Bottom Hole Location: | Sec:25 Twp: 3N 67 | Footage: 1298 FNL 80 FEL | Log Types: | CBL/GRL/CCL, DIL/GL/GRL, CDL/CNL/ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 611 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 485, Top: 0 ft., Bottom: 611 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8103 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 2030 ft., Bottom: 8103 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1400 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 164 ft., Bottom: 1420 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7137 ft. | | | | FORT HAYS | 7415 ft. | | | | CODELL | 7436 ft. | | | | D SAND | 7817 ft. | | | | MOWRY | 7838 ft. | | | | J SAND | 7875 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 8/26/2024 Interval Top: 7878 ft. Interval Bottom: 7929 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/8/2011 | Choke Size: | 0.000 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/7/2011 | Treatment Summary: | Frac'd the J-Sand w/ 150177 gals of Silverstim and Slick Water with 291,520#'s of Ottawa sand.
The J-Sand is producing through a composite Flow Through Plug.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/14/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 39 | BBLS_OIL | 72 | BTU_GAS | 1319 | CALC_BBLS_H2O | 39 | CALC_BBLS_OIL | 72 | CALC_GOR | 2750 | CALC_MCF_GAS | 198 | CASING_PRESS | 750 | GRAVITY_OIL | 51 | MCF_GAS | 198 |
| Perforation Data: | Interval Top: | 7878 ft. | # Of Holes: | 104 | Interval Bottom: | 7929 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/26/2024 Interval Top: 7225 ft. Interval Bottom: 7456 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/8/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/7/2011 | Treatment Summary: | Frac'd Niobrara-Codell w/ 300553 gals of Silverstim and Slick Water with 499,240#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/14/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 39 | BBLS_OIL | 72 | BTU_GAS | 1319 | CALC_BBLS_H2O | 39 | CALC_BBLS_OIL | 72 | CALC_GOR | 2750 | CALC_MCF_GAS | 18 | CASING_PRESS | 750 | GRAVITY_OIL | 51 | MCF_GAS | 198 |
| Perforation Data: | Interval Top: | 7225 ft. | # Of Holes: | 120 | Interval Bottom: | 7456 ft. | Hole Size: | 0 in. |
|
|
|
|
|
Reported Plugged | Y | 08/26/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|