|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/26/2024 Measured TD: 8367 ft. Vertical TD: 7921 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/26/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 2/6/2012 | Proposed Top PZ Location: | Sec:30 Twp: 3N 66W | Footage: 2562 FSL 94 FWL | Bottom Hole Location: | Sec:30 Twp: 3N 66W | Footage: 2564 FSL 94 FWL | Proposed Depth/Form: | 8268 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA-SEE COMMENTS | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 540 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 228, Top: 0 ft., Bottom: 540 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8268 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 557, Top: , Bottom: 8268 ft. |
| | |
Wellbore Completed | Completion Date: | 11/7/2010 | Spud Date: | 11/3/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8367 ft. | Measured PB depth: | 8308 ft. | True Vertical TD: | 7921 ft. | True Vertical PB depth: | 7865 ft. | Top PZ Location: | Sec:30 Twp: 3N 66W | Footage: 2562 FSL 94 FWL | Bottom Hole Location: | Sec:30 Twp: 3N 66W | Footage: 2564 FSL 94 FWL | Log Types: | CBL, Triple Combo | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 607 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 265, Top: 0 ft., Bottom: 607 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8354 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 755, Top: 1830 ft., Bottom: 8354 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1300 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 208 ft., Bottom: 1340 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7457 ft. | | | | FORT HAYS | 7733 ft. | | | | CODELL | 7754 ft. | | | | D SAND | 8129 ft. | | | | MOWRY | 8154 ft. | | | | J SAND | 8192 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 8/26/2024 Interval Top: 8194 ft. Interval Bottom: 8238 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/19/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/29/2010 | Treatment Summary: | Frac'd J Sand w/132430 gals Silverstim with 181040 lbs Ottawa sand |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/25/2011 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 9 | BTU_GAS | 1157 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 9 | CALC_GOR | 73111 | CALC_MCF_GAS | 658 | CASING_PRESS | 700 | GRAVITY_OIL | 62 | MCF_GAS | 658 |
| Perforation Data: | Interval Top: | 8194 ft. | # Of Holes: | 84 | Interval Bottom: | 8238 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/26/2024 Interval Top: 7542 ft. Interval Bottom: 7774 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/26/2011 | Choke Size: | 0.000 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/29/2010 | Treatment Summary: | Frac'd Niobrara-Codell w/ 275965 gals of Silverstim and Slick Water with 494,500#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/26/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 91 | BTU_GAS | 1171 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 91 | CALC_GOR | 427 | CALC_MCF_GAS | 213 | CASING_PRESS | 820 | GRAVITY_OIL | 49 | MCF_GAS | 213 |
| Perforation Data: | Interval Top: | 7542 ft. | # Of Holes: | 120 | Interval Bottom: | 7774 ft. | Hole Size: | 0 in. |
|
|
|
|
|
Reported Plugged | Y | 08/26/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|