|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/26/2024 Measured TD: 8137 ft. Vertical TD: 8012 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/26/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/18/2012 | | Proposed Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 129 FSL 1178 FWL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 137 FSL 1179 FWL | | Proposed Depth/Form: | 8069 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8069 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7057 ft., Bottom: 8069 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5104 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4185 ft., Bottom: 5104 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/20/2010 | | Spud Date: | 6/15/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8137 ft. | Measured PB depth: | 8052 ft. | | True Vertical TD: | 8012 ft. | True Vertical PB depth: | 7927 ft. | | Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 129 FSL 1178 FWL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 137 FSL 1179 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 670 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 670 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8121 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 3220 ft., Bottom: 8121 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4388 ft. | | | | | NIOBRARA | 7296 ft. | | | | | CODELL | 7556 ft. | | | | | J SAND | 7984 ft. | | | |
Formation JSND Formation Classification: Status: AB - 1/26/2024 Interval Top: 7996 ft. Interval Bottom: 8016 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/1/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 154,938 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,140# 20/40 SAND. 06/25/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7996 ft. | # Of Holes: | 40 | | Interval Bottom: | 8016 ft. | Hole Size: | |
|
Formation CODL Formation Classification: Status: CM - 8/1/2010 Interval Top: 7556 ft. Interval Bottom: 7574 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/1/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7556 ft. | # Of Holes: | 13 | | Interval Bottom: | 7574 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/12/2010 Interval Top: 7346 ft. Interval Bottom: 8016 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/12/2010 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7280'. 08/09/2010. DRILLED OUT CBP @ 7260', CFP @ 7450' AND 7650' TO COMMINGLE THE JSND-CDL-NBRR. 08/10/2010. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7970 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/12/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 36 | | BBLS_OIL | 13 | | CALC_BBLS_H2O | 38 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 26846 | | CALC_MCF_GAS | 349 | | CASING_PRESS | 1430 | | MCF_GAS | 349 | | TUBING_PRESS | 1130 |
| | Perforation Data: | | Interval Top: | 7346 ft. | # Of Holes: | 156 | | Interval Bottom: | 8016 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: Status: AB - 1/26/2024 Interval Top: 7346 ft. Interval Bottom: 7574 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/1/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2010 | | Treatment Summary: | CODL-NBRR COMPLETION. SET CFP @ 7650'. 06/25/2010. FRAC'D THE CODELL WITH 109,326 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,476 # 20/40 SAND. 06/25/2010. SET CFP @ 7450'. 06/25/2010. FRAC'D THE NIOBRARA WITH 145,278 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,520# 20/40 SAND. 06/25/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7346 ft. | # Of Holes: | 116 | | Interval Bottom: | 7574 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 8/1/2010 Interval Top: 7346 ft. Interval Bottom: 7366 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/1/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7346 ft. | # Of Holes: | 103 | | Interval Bottom: | 7366 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/26/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|