|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/27/2024 Measured TD: 8714 ft. Vertical TD: 8333 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/27/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/9/2012 | Proposed Top PZ Location: | Sec:35 Twp: 1N 67W | Footage: 660 FSL 1980 FWL | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 660 FSL 1980 FWL | Proposed Depth/Form: | 8711 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8711 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8711 ft. |
| | |
Wellbore Completed | Completion Date: | 1/1/2011 | Spud Date: | 12/29/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8714 ft. | Measured PB depth: | 8645 ft. | True Vertical TD: | 8333 ft. | True Vertical PB depth: | 8264 ft. | Top PZ Location: | Sec:35 Twp: 1N 67W | Footage: 664 FSL 1981 FWL | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 667 S 1981 W | Log Types: | PRELIMINARY FORM 5 | Log Types: | P/E AILC-CNLD-ML-CV, BCS; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1193 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 0 ft., Bottom: 1193 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8678 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1050, Top: 3186 ft., Bottom: 8678 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4680 ft. | 4715 ft. | | | SUSSEX | 5169 ft. | 5414 ft. | | | NIOBRARA | 7681 ft. | | | | FORT HAYS | 8099 ft. | | | | CODELL | 8120 ft. | | | | J SAND | 8558 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/27/2024 Interval Top: 8572 ft. Interval Bottom: 8602 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/31/2011 | Treatment Summary: | J S Perf 8572-8602 Holes 64 Size 0.40
Frac J-Sand down 4-1/2" Csg w/ 148,386 gal Slickwater w/ 115,400# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8572 ft. | # Of Holes: | 64 | Interval Bottom: | 8602 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/30/2011 Interval Top: 7704 ft. Interval Bottom: 8602 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/31/2011 | Treatment Summary: | NB Perf 7704-7981 Holes 64 Size 0.42
CD Perf 8124-8140 Holes 64 Size 0.40
J S Perf 8572-8602 Holes 64 Size 0.40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/30/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 40 | BTU_GAS | 1316 | CALC_BBLS_OIL | 40 | CALC_GOR | 3700 | CALC_MCF_GAS | 148 | CASING_PRESS | 856 | GRAVITY_OIL | 45 | MCF_GAS | 148 |
| Perforation Data: | Interval Top: | 7704 ft. | # Of Holes: | 192 | Interval Bottom: | 8602 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/27/2024 Interval Top: 7704 ft. Interval Bottom: 8140 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/24/2011 | Treatment Summary: | NB Perf 7704-7981 Holes 64 Size 0.42 CD Perf 8124-8140 Holes 64 Size 0.40
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 252,042 gal Slickwater w/ 200,960# 40/70, 4,340# SB Excel
Frac Codell down 4-1/2" Csg w/ 208,194 gal Slickwater w/ 150,040# 40/70, 4,200# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7704 ft. | # Of Holes: | 128 | Interval Bottom: | 8140 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | Y | 06/27/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|