|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/27/2024 Measured TD: 8742 ft. Vertical TD: 8307 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/27/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/9/2012 | Proposed Top PZ Location: | Sec:35 Twp: 1N 67W | Footage: 65 FSL 1332 FWL | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 66 FSL 1367 FWL | Proposed Depth/Form: | 8727 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8727 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8727 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 1/2/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8742 ft. | Measured PB depth: | 8698 ft. | True Vertical TD: | 8307 ft. | True Vertical PB depth: | 8263 ft. | Top PZ Location: | Sec:35 Twp: 1N 67W | Footage: 65 FSL 1332 FWL | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 66 S 1367 W | Log Types: | PRELIMINARY FORM 5 | Log Types: | P/E AILC-CNLD-ML-TC; CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1193 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 0 ft., Bottom: 1193 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8730 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1037, Top: 2985 ft., Bottom: 8730 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1791 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 600 ft., Bottom: 1920 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4775 ft. | 4970 ft. | | | SUSSEX | 5270 ft. | 5415 ft. | | | NIOBRARA | 7748 ft. | | | | FORT HAYS | 8169 ft. | | | | CODELL | 8192 ft. | | | | J SAND | 8625 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/27/2024 Interval Top: 8640 ft. Interval Bottom: 8670 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/29/2011 | Treatment Summary: | J S Perf 8640-8670 Holes 60 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 149,609 gal Slickwater w/ 116,480# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8640 ft. | # Of Holes: | 60 | Interval Bottom: | 8670 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/25/2011 Interval Top: 7772 ft. Interval Bottom: 8670 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/29/2011 | Treatment Summary: | NB Perf 7772-8052 Holes 64 Size 0.42
CD Perf 8194-8206 Holes 60 Size 0.42
J S Perf 8640-8670 Holes 60 Size 0.42
|
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8631 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/25/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 30 | BTU_GAS | 1316 | CALC_BBLS_OIL | 30 | CALC_GOR | 4733 | CALC_MCF_GAS | 142 | CASING_PRESS | 1078 | GRAVITY_OIL | 45 | MCF_GAS | 142 |
| Perforation Data: | Interval Top: | 7772 ft. | # Of Holes: | 184 | Interval Bottom: | 8670 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/27/2024 Interval Top: 7772 ft. Interval Bottom: 8206 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/21/2011 | Treatment Summary: | NB Perf 7772-8052 Holes 64 Size 0.42 CD Perf 8194-8206 Holes 60 Size 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 248,936 gal Slickwater w/ 200,000# 40/70, 4,200# SB Excel
Frac Codell down 4-1/2" Csg w/ 202,524 gal Slickwater w/ 149,880# 40/70, 4,180# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7772 ft. | # Of Holes: | 124 | Interval Bottom: | 8206 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 06/27/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|