|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/27/2024 Measured TD: 8750 ft. Vertical TD: 8299 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/27/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/9/2012 | Proposed Top PZ Location: | Sec:35 Twp: 1N 67W | Footage: 1345 FSL 2552 FWL | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 1348 FSL 2555 FWL | Proposed Depth/Form: | 8736 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2SW/4, W/2SE/4 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: E/2SW/4, W/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8736 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8736 ft. |
| | |
Wellbore Completed | Completion Date: | 12/29/2010 | Spud Date: | 12/25/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8750 ft. | Measured PB depth: | 8710 ft. | True Vertical TD: | 8299 ft. | True Vertical PB depth: | 8259 ft. | Top PZ Location: | Sec:35 Twp: 1N 67W | Footage: 1345 FSL 2552 FWL | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 1348 S 2555 W | Log Types: | PRELIMINARY FORM 5 | Log Types: | P/E AILC-CNLD-CV-ML-TC; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1193 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 0 ft., Bottom: 1193 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8739 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1080, Top: 2880 ft., Bottom: 8739 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4733 ft. | 4950 ft. | | | SUSSEX | 5105 ft. | 5405 ft. | | | NIOBRARA | 7752 ft. | | | | FORT HAYS | 8172 ft. | | | | CODELL | 8195 ft. | | | | J SAND | 8635 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/27/2024 Interval Top: 8648 ft. Interval Bottom: 8676 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/3/2011 | Treatment Summary: | J S Perf 8648-8676 Holes 66 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 149,646 gal Slickwater w/ 115,340# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8648 ft. | # Of Holes: | 66 | Interval Bottom: | 8676 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/30/2011 Interval Top: 7774 ft. Interval Bottom: 8676 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/3/2011 | Treatment Summary: | NB Perf 7774-8054 Holes 72 Size 0.42
CD Perf 8197-8211 Holes 56 Size 0.40
J S Perf 8648-8676 Holes 66 Size 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/30/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 40 | BTU_GAS | 1316 | CALC_BBLS_OIL | 40 | CALC_GOR | 1100 | CALC_MCF_GAS | 44 | CASING_PRESS | 373 | GRAVITY_OIL | 45 | MCF_GAS | 44 |
| Perforation Data: | Interval Top: | 7774 ft. | # Of Holes: | 194 | Interval Bottom: | 8676 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/27/2024 Interval Top: 7774 ft. Interval Bottom: 8211 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/16/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/28/2011 | Treatment Summary: | NB Perf 7774-8054 Holes 72 Size 0.42 CD Perf 8197-8211 Holes 56 Size 0.40
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 252,000 gal Slickwater w/ 200,680# 40/70, 4,120# SB Excel
Frac Codell down 4-1/2" Csg w/ 199,248 gal Slickwater w/ 150,160# 40/70, 4,120# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7774 ft. | # Of Holes: | 128 | Interval Bottom: | 8211 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 06/27/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|