|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/5/2023 Measured TD: 8585 ft. Vertical TD: 8470 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/5/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/29/2011 | Proposed Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 513 FNL 2127 FEL | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 503 FNL 2118 FEL | Proposed Depth/Form: | 8554 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NE4 | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2NE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1000 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8554 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8554 ft. |
| | |
Wellbore Completed | Completion Date: | 5/30/2010 | Spud Date: | 5/26/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8585 ft. | Measured PB depth: | 8538 ft. | True Vertical TD: | 8470 ft. | True Vertical PB depth: | 8423 ft. | Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 513 FNL 2127 FEL | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 503 FNL 2118 FEL | Log Types: | PRELIMINARY FORM 5 | Log Types: | CBL, DI-GL-GR, CD-CN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1039 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 650, Top: 0 ft., Bottom: 1039 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8574 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1090, Top: 3972 ft., Bottom: 8574 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4496 ft. | 4532 ft. | | | SUSSEX | 4859 ft. | 5182 ft. | | | NIOBRARA | 7565 ft. | | | | FORT HAYS | 7986 ft. | | | | CODELL | 8006 ft. | | | | J SAND | 8436 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/5/2023 Interval Top: 7582 ft. Interval Bottom: 8024 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/4/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/2/2010 | Treatment Summary: | NB PERF 7582-7876 HOLES 66 SIZE 0.42 CD PERF 8008-8024 HOLES 64 SIZE 0.42
FRAC NB W/ 240, 452 GAL SW, 250 GAL HCL, 200,200# 40/70 SAND, 4,000# SB SAND
FRAC CD W/ 201,012 GAL SW, 151,080# 40/70 SAND, 4,000# SB SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/10/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1204 | CALC_BBLS_OIL | 2 | CALC_GOR | 5000 | CALC_MCF_GAS | 10 | CASING_PRESS | 1300 | GRAVITY_OIL | 47 |
| Perforation Data: | Interval Top: | 7582 ft. | # Of Holes: | 130 | Interval Bottom: | 8024 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 07/05/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|