|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/3/2023 Measured TD: 8290 ft. Vertical TD: 8053 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/3/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/29/2011 | Proposed Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 1325 FNL 66 FEL | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 1323 FNL 61 FEL | Proposed Depth/Form: | 8208 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1000 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8208 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8208 ft. |
| | |
Wellbore Completed | Completion Date: | 6/11/2010 | Spud Date: | 6/8/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8290 ft. | Measured PB depth: | 8234 ft. | True Vertical TD: | 8053 ft. | True Vertical PB depth: | 8000 ft. | Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 1325 FNL 66 FEL | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 1323 FNL 61 FEL | Log Types: | | Log Types: | CBL, DI-GL-GR, CD-CN-ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1018 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8290 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 990, Top: 706 ft., Bottom: 8290 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4448 ft. | | | | SUSSEX | 4944 ft. | | | | TEEPEE BUTTES | 7170 ft. | | | | NIOBRARA | 7690 ft. | | | | FORT HAYS | 8102 ft. | | | | CODELL | 8124 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/3/2023 Interval Top: 7704 ft. Interval Bottom: 8144 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/5/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/13/2010 | Treatment Summary: | NB PERF 7704-7988 HOLES 60 SIZE 0.42 CD PERF 8124-8144 HOLES 60 SIZE 0.42
FRAC NB W 248,096 GAL SW, 250GAL 15% HC1, 200,280# 40/70 SAND, 4,000# SB SAND.
FRAC CD W/ 202,314 GAL SW, 150,320# 40/70 SAND 4,000# SB SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/11/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1204 | CALC_BBLS_OIL | 12 | CALC_GOR | 250 | CALC_MCF_GAS | 3 | CASING_PRESS | 1450 | GRAVITY_OIL | 47 |
| Perforation Data: | Interval Top: | 7704 ft. | # Of Holes: | 120 | Interval Bottom: | 8144 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 07/03/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|