|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/16/2018 Measured TD: 8062 ft. Vertical TD: 7932 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/16/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/17/2011 | Proposed Top PZ Location: | Sec:32 Twp: 3N 67W | Footage: 1275 FSL 1248 FEL | Bottom Hole Location: | Sec:32 Twp: 3N 67W | Footage: 1270 FSL 1236 FEL | Proposed Depth/Form: | 8058 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1155 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 809, Top: 0 ft., Bottom: 1155 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8058 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8058 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 1/19/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8062 ft. | Measured PB depth: | 8020 ft. | True Vertical TD: | 7932 ft. | True Vertical PB depth: | 7890 ft. | Top PZ Location: | Sec:32 Twp: 3N 67 | Footage: 1275 FSL 1248 FEL | Bottom Hole Location: | Sec:32 Twp: 3N 67 | Footage: 1270 S 1236 E | Log Types: | PRELIMINARY FORM 5 | Log Types: | CD-CN-ML, HRI; CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1167 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 730, Top: 0 ft., Bottom: 1167 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8053 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1020, Top: 474 ft., Bottom: 8053 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 444 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 25, Top: 234 ft., Bottom: 460 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 236 ft., Depth: 433 ft., Bottom: 461 ft., Sacks: 24, Method: 1 INCH | Additional Cement: | String Type: 1ST , Top: , Depth: 444 ft., Bottom: , Sacks: , Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4250 ft. | | | | NIOBRARA | 7167 ft. | | | | FORT HAYS | 7425 ft. | | | | CODELL | 7446 ft. | | | | J SAND | 7887 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 11/16/2018 Interval Top: 7193 ft. Interval Bottom: 7468 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/22/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/8/2011 | Treatment Summary: | NB Perf 7193-7328 Holes 56 Size 0.42 CD Perf 7448-7468 Holes 60 Size 0.38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 237,468 gal Slickwater w/ 202,320# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 207,228 gal Slickwater w/ 150,540# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/3/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 68 | BTU_GAS | 1182 | CALC_BBLS_OIL | 68 | CALC_GOR | 3441 | CALC_MCF_GAS | 234 | CASING_PRESS | 1412 | GRAVITY_OIL | 49 | MCF_GAS | 234 |
| Perforation Data: | Interval Top: | 7193 ft. | # Of Holes: | 116 | Interval Bottom: | 7468 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 11/16/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|