|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/1/2018 Measured TD: 8274 ft. Vertical TD: 8184 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/1/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/8/2011 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 2500 FNL 50 FWL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 2500 FNL 50 FWL | | Proposed Depth/Form: | 8224 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 130, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8224 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7147 ft., Bottom: 8224 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5131 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4146 ft., Bottom: 5131 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/29/2011 | | Spud Date: | 7/23/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8274 ft. | Measured PB depth: | 8228 ft. | | True Vertical TD: | 8184 ft. | True Vertical PB depth: | 8138 ft. | | Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 2457 FNL 47 FWL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 2454 FNL 52 FWL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON (2203930-931) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 872 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 872 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8262 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 403, Top: 5513 ft., Bottom: 8262 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5376 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 281, Top: 3612 ft., Bottom: 5376 ft., Determination Method: CBL | | Additional Cement: | String Type: S.C. 1.1 , Top: 3612 ft., Depth: 5376 ft., Bottom: 5376 ft., Sacks: 281, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4360 ft. | | | | | NIOBRARA | 7337 ft. | | | | | CODELL | 7638 ft. | | | | | J SAND | 8069 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/1/2018 Interval Top: 8075 ft. Interval Bottom: 8095 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/29/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/21/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC’D THE J-SAND 8075’-8095’, (40 HOLES) W/59,598 GAL 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,000# 30/50 SAND. 08/21/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8075 ft. | # Of Holes: | 40 | | Interval Bottom: | 8095 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/12/2011 Interval Top: 7412 ft. Interval Bottom: 8095 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/29/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/21/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. DRILLED OUT CBP @ 7350' 11/04/11. DRILLED OUT CFP @ 7510' AND 7710 TO COMMINGLE THE JSND-CDL-NBRR. 11/08/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8054 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/12/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 183 | | BBLS_OIL | 49 | | BTU_GAS | 1333 | | CALC_BBLS_H2O | 183 | | CALC_BBLS_OIL | 49 | | CALC_GOR | 5959 | | CALC_MCF_GAS | 292 | | CASING_PRESS | 1490 | | GRAVITY_OIL | 52 | | MCF_GAS | 292 | | TUBING_PRESS | 580 |
| | Perforation Data: | | Interval Top: | 7412 ft. | # Of Holes: | 180 | | Interval Bottom: | 8095 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/1/2018 Interval Top: 7412 ft. Interval Bottom: 7658 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/29/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/21/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7710’. 08/21/11. FRAC’D THE CODELL 7638’-7658’, (40 HOLES) W/85,890 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 231,610# 30/50 SAND. 08/21/11. SET CFP @ 7510’. 08/21/11. FRAC’D THE NIOBRARA 7412’-7437’, (100 HOLES) W/79,578 GAL 18 # PHASER SILVERSTIM CROSS LINKED GEL CONTAINING 151,840# 30/50 SAND. 08/28/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7412 ft. | # Of Holes: | 140 | | Interval Bottom: | 7658 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/01/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|