|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/13/2025 Measured TD: 7236 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/13/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 12/5/2011 | | Proposed Depth/Form: | 7225 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 525 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 226, Top: 0 ft., Bottom: 525 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7225 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 403, Top: , Bottom: 7225 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/7/2010 | | Spud Date: | 2/4/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7236 ft. | Measured PB depth: | 7181 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/GR/CCL, CDL/CNL/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 386, Top: 0 ft., Bottom: 600 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7226 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 2484 ft., Bottom: 7226 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6747 ft. | | | | | FORT HAYS | 7045 ft. | | | | | CODELL | 7068 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 6/10/2022 Interval Top: 7074 ft. Interval Bottom: 7089 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/30/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2010 | | Treatment Summary: | FRAC'D CODELL W/ 134022 GALS SILVERSTIM AND SLICK WATER WITH 271,003#'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7074 ft. | # Of Holes: | 60 | | Interval Bottom: | 7089 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/13/2025 Interval Top: 6770 ft. Interval Bottom: 7089 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/30/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2010 | | Treatment Summary: | COMMINGLE NB & CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 21 | | BTU_GAS | 1261 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 26190 | | CALC_MCF_GAS | 550 | | CASING_PRESS | 700 | | GRAVITY_OIL | 64 | | MCF_GAS | 550 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 6770 ft. | # Of Holes: | 108 | | Interval Bottom: | 7089 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/10/2022 Interval Top: 6770 ft. Interval Bottom: 6903 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/30/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2010 | | Treatment Summary: | FRAC'D NIOBRARA W/ 174342 GALS SILVERSTIM AND SLICK WATER WITH 250,451#'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6770 ft. | # Of Holes: | 48 | | Interval Bottom: | 6903 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/13/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|