|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/14/2020 Measured TD: 8050 ft. Vertical TD: 7924 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/14/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/5/2011 | | Proposed Top PZ Location: | Sec:18 Twp: 3N 66W | Footage: 2545 FNL 1185 FEL | | Bottom Hole Location: | Sec:18 Twp: 3N 66W | Footage: 2545 FNL 1185 FEL | | Proposed Depth/Form: | 7579 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7579 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7579 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/3/2010 | | Spud Date: | 10/30/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8050 ft. | Measured PB depth: | 8010 ft. | | True Vertical TD: | 7924 ft. | True Vertical PB depth: | 7884 ft. | | Top PZ Location: | Sec:18 Twp: 3N 66W | Footage: 2545 FNL 1187 FEL | | Bottom Hole Location: | Sec:18 Twp: 3N 66W | Footage: 2529 FNL 1200 FEL | | Log Types: | Preliminary Form 5 | | Log Types: | SD-DSN-AC-TR; XIPE; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 832 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 832 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8041 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1070, Top: 570 ft., Bottom: 8041 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 4.5 in., Size: 3.5 in., Top: 0 ft., Depth: 8001 ft., Weight: 9.2 , Citings Type: ACTUAL | | Cement: | Sacks: 97, Top: 815 ft., Bottom: 8001 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3928 ft. | 4002 ft. | | | | SUSSEX | 4368 ft. | 4638 ft. | | | | NIOBRARA | 7163 ft. | | | | | FORT HAYS | 7426 ft. | | | | | CODELL | 7446 ft. | | | | | J SAND | 7984 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 1/14/2020 Interval Top: 7188 ft. Interval Bottom: 7468 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/27/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/20/2011 | | Treatment Summary: | NB PERF 7188-7310 HOLES 66 SIZE 0.24 CD PERF 7448-7468 HOLES 80 SIZE 0.24
Frac Niobrara A & B & C down 3-1/2" Csg w/ 250 gal 15% HCl & 231,044 gal Slickwater w/ 200,580# 40/70, 4,000# SB Excel
Frac Codell down 3-1/2" Csg w/ 195,678 gal Slickwater w/ 150,140# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/29/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 45 | | BTU_GAS | 1259 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 10667 | | CALC_MCF_GAS | 480 | | CASING_PRESS | 650 | | GRAVITY_OIL | 54 | | MCF_GAS | 480 |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 146 | | Interval Bottom: | 7468 ft. | Hole Size: | 0.24 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/14/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|