|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/1/2018 Measured TD: 8189 ft. Vertical TD: 8025 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/1/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/5/2011 | | Proposed Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 1433 FNL 2588 FEL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 1430 FNL 2582 FEL | | Proposed Depth/Form: | 8130 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7777 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7777 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/14/2010 | | Spud Date: | 5/10/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8189 ft. | Measured PB depth: | 8142 ft. | | True Vertical TD: | 8025 ft. | True Vertical PB depth: | 7978 ft. | | Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 1433 FNL 2588 FEL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 1430 FNL 2582 FEL | | Log Types: | CD-CN-ML, DI-GL-GR, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 837 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 837 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8179 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1097, Top: 900 ft., Bottom: 8179 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3968 ft. | 4170 ft. | | | | SUSSEX | 4396 ft. | 4625 ft. | | | | SHANNON | 4968 ft. | 5080 ft. | | | | NIOBRARA | 7342 ft. | | | | | FORT HAYS | 7541 ft. | | | | | CODELL | 7563 ft. | | | | | J SAND | 8004 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 12/28/2018 Interval Top: 7358 ft. Interval Bottom: 7584 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/18/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/10/2010 | | Treatment Summary: | NBRR PERF 7358-7442 HOLES 64 SIZE 0.42, CODL PERF 7566-7584 HOLES 54 SIZE 0.38
FRAC NBRR W/4578 GAL 15% HCL & 451303 GAL SW & 218819# 40/70 SAND & 8000# SB EXCEL
FRAC CODL W/ 194040 GAL SW & 133760# 40/70 SAND & 4000# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1288 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 4257 | | CALC_MCF_GAS | 149 | | CASING_PRESS | 1450 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7358 ft. | # Of Holes: | 118 | | Interval Bottom: | 7584 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/28/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|