|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/3/2025 Measured TD: 8230 ft. Vertical TD: 8160 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/3/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/29/2011 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 50 FSL 2590 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 67W | Footage: 50 FSL 2590 FWL | | Proposed Depth/Form: | 8153 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 790 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 790 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8153 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7088 ft., Bottom: 8153 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5267 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4263 ft., Bottom: 5267 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/6/2010 | | Spud Date: | 7/2/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8230 ft. | Measured PB depth: | 8072 ft. | | True Vertical TD: | 8160 ft. | True Vertical PB depth: | 8012 ft. | | Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 71 FSL 2565 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 67W | Footage: 79 FSL 2554 FWL | | Log Types: | CBL doc# 700075145 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 820 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 820 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8219 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 3380 ft., Bottom: 8230 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4514 ft. | | N | N | | NIOBRARA | 7334 ft. | | N | N | | CODELL | 7596 ft. | | N | N | | J SAND | 8026 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/3/2025 Interval Top: 8026 ft. Interval Bottom: 8054 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/23/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/13/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 171,318 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,780# SAND. 07/13/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8026 ft. | # Of Holes: | 40 | | Interval Bottom: | 8054 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 11/6/2024 Interval Top: 7596 ft. Interval Bottom: 7616 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7596 ft. | # Of Holes: | 12 | | Interval Bottom: | 7616 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/10/2010 Interval Top: 7378 ft. Interval Bottom: 8054 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/10/2010 | | Treatment Summary: | JSND-CODL-NRR COMMINGLE. SET CBP 7200'. 08/04/2010. DRILLED OUT CP @ 7200', CFP @ 7500' AND 7700 TO COMMINGLE THE JSND-CODL-NBRR. 08/05/2010. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8006 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/10/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 19 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 190 | | CASING_PRESS | 1312 | | MCF_GAS | 190 | | TUBING_PRESS | 512 |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 160 | | Interval Bottom: | 8054 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/3/2025 Interval Top: 7378 ft. Interval Bottom: 7616 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/23/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/13/2010 | | Treatment Summary: | CODL-NBRR COMPLETION. SET CFP @ 7700'. 07/13/2010. FRAC'D THE CODELL WITH 110,208 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,700# 20/40 SAND. 07/13/2010. SET CFP @ 7500'. 07/13/2010. FRAC'D THE NIOBRARA WITH 136,626 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,520# 20/40 SAND. 07/13/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 120 | | Interval Bottom: | 7616 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 11/6/2024 Interval Top: 7378 ft. Interval Bottom: 7398 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 108 | | Interval Bottom: | 7398 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/03/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|