|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/11/2019 Measured TD: 8390 ft. Vertical TD: 8055 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/11/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/24/2011 | | Proposed Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 1370 FSL 2331 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 1373 FSL 2328 FEL | | Proposed Depth/Form: | 8349 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 8/2/2010 | | Spud Date: | 7/28/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8390 ft. | Measured PB depth: | 8320 ft. | | True Vertical TD: | 8055 ft. | True Vertical PB depth: | 7985 ft. | | Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 1370 FSL 2331 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 1373 FSL 2328 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 698 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 698 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8376 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6650 ft., Bottom: 8376 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5595 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 3720 ft., Bottom: 5595 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4494 ft. | | | | | NIOBRARA | 7502 ft. | | | | | CODELL | 7760 ft. | | | | | J SAND | 8186 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/11/2019 Interval Top: 8186 ft. Interval Bottom: 8222 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/18/2010 | | Treatment Summary: | J SAND COMPLETION: FRAC J-SAND WITH 153,300 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,640# 20/40 SAND 08-18-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8186 ft. | # Of Holes: | 56 | | Interval Bottom: | 8222 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/2/2010 Interval Top: 7544 ft. Interval Bottom: 8222 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/2/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE: SET CBP @ 7450'. 8-30-10. DRILLED OUT CBP@ 7450', CFP @ 7640' AND CFP @ 7880' TO COMMINGLE THE JSND-NBRR-CDL. 8-31-10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8157 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/2/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 84 | | BBLS_OIL | 48 | | CALC_BBLS_H2O | 84 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 7250 | | CALC_MCF_GAS | 348 | | CASING_PRESS | 1324 | | MCF_GAS | 348 | | TUBING_PRESS | 654 |
| | Perforation Data: | | Interval Top: | 7544 ft. | # Of Holes: | 176 | | Interval Bottom: | 8222 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/11/2019 Interval Top: 7544 ft. Interval Bottom: 7780 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/19/2010 | | Treatment Summary: | CDL-NBRR COMPLETION: SET CFP @ 7880'. 08-18-10. FRAC'D THE CODELL WITH 108,654 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,120# 30/50 SAND. 08-189-10. SET CFP @ 7640'. 08-19-10. FRAC'D NIOBRARA WITH 145,404 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,960# 30/50 SAND. 08-19-10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7544 ft. | # Of Holes: | 120 | | Interval Bottom: | 7780 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/11/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|