|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/2/2023 Measured TD: 7330 ft. Vertical TD: 7187 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/2/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/23/2011 | Proposed Top PZ Location: | Sec:31 Twp: 5N 64W | Footage: 1307 FNL 2571 FEL | Bottom Hole Location: | Sec:31 Twp: 5N 64W | Footage: 1306 FNL 2570 FEL | Proposed Depth/Form: | 7331 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 212, Top: 0 ft., Bottom: 500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7331 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 670, Top: , Bottom: 7331 ft. |
| | |
Wellbore Completed | Completion Date: | 2/27/2010 | Spud Date: | 2/24/2010 | Spud Date Is: | ACTUAL | Measured TD: | 7330 ft. | Measured PB depth: | 7277 ft. | True Vertical TD: | 7187 ft. | True Vertical PB depth: | 7134 ft. | Top PZ Location: | Sec:31 Twp: 5N 64W | Footage: 1307 FNL 2571 FEL | Bottom Hole Location: | Sec:31 Twp: 5N 64W | Footage: 1306 FNL 2570 FEL | Log Types: | CBL/GR/CCL,CDL/CNL/ML,DIL/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 546 ft., Weight: 32 , Citings Type: ACTUAL | Cement: | Sacks: 207, Top: 0 ft., Bottom: 546 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7322 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 585, Top: 2188 ft., Bottom: 7322 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6885 ft. | | | | FORT HAYS | 7150 ft. | | | | CODELL | 7172 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 5/29/2019 Interval Top: 7174 ft. Interval Bottom: 7186 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/22/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2010 | Treatment Summary: | FRAC'D CDELL W/133768 GALS OFPHASERFRAC AND SLICK WATER WITH 268,880#'S OF OTTAWA SAND. THE CODELL IS PRODUCING THROUGH A COMPOSITE FLOW PLUG. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7174 ft. | # Of Holes: | 48 | Interval Bottom: | 7186 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/2/2023 Interval Top: 6890 ft. Interval Bottom: 7186 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/22/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2010 | Treatment Summary: | COMMINGLED CODELL/NIOBRARA |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 22 | BBLS_OIL | 52 | BTU_GAS | 1240 | CALC_BBLS_H2O | 22 | CALC_BBLS_OIL | 52 | CALC_GOR | 7942 | CALC_MCF_GAS | 413 | CASING_PRESS | 600 | GRAVITY_OIL | 57376 | MCF_GAS | 413 |
| Perforation Data: | Interval Top: | 6890 ft. | # Of Holes: | 96 | Interval Bottom: | 7186 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 5/29/2019 Interval Top: 6890 ft. Interval Bottom: 7008 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/22/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2010 | Treatment Summary: | FRAC'D NIOBRARAW/275337 GALS OF PHASERFRAC AND SLICK WATER WITH 400,400#'S OF OTTAWA SAND. THE NIOBRARA IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6890 ft. | # Of Holes: | 48 | Interval Bottom: | 7008 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
Reported Plugged | Y | 11/02/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|