|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/16/2025 Measured TD: 7070 ft. Vertical TD: 6926 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/16/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/23/2011 | | Proposed Top PZ Location: | Sec:23 Twp: 4N 64W | Footage: 71 FNL 2600 FEL | | Bottom Hole Location: | Sec:23 Twp: 4N 64W | Footage: 70 FNL 2607 FEL | | Proposed Depth/Form: | 7035 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 520 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 520 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7035 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 626, Top: , Bottom: 7035 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/15/2011 | | Spud Date: | 11/11/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7070 ft. | Measured PB depth: | 7015 ft. | | True Vertical TD: | 6926 ft. | True Vertical PB depth: | 6871 ft. | | Top PZ Location: | Sec:23 Twp: 4N 64W | Footage: 71 FNL 2600 FEL | | Bottom Hole Location: | Sec:23 Twp: 4N 64W | Footage: 70 FNL 2607 FEL | | Log Types: | CBL
Triple Combo
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 599 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 258, Top: 0 ft., Bottom: 599 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7060 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 565, Top: 2053 ft., Bottom: 7060 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3626 ft. | | | | | SUSSEX | 4347 ft. | | | | | SHANNON | 5010 ft. | | | | | NIOBRARA | 6594 ft. | | | | | FORT HAYS | 6858 ft. | | | | | CODELL | 6884 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/24/2024 Interval Top: 6885 ft. Interval Bottom: 6897 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/16/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6885 ft. | # Of Holes: | 48 | | Interval Bottom: | 6897 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/16/2025 Interval Top: 6690 ft. Interval Bottom: 6897 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/16/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/29/2011 | | Treatment Summary: | Pumped 468,740 lbs of Ottawa Proppant and 271,559 gallons of 15% HCL and Slick Water and Silverstim.
The Codell is producing through a composite flow through plug |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 40 | | BTU_GAS | 1209 | | CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 2600 | | CALC_MCF_GAS | 104 | | CASING_PRESS | 1685 | | GRAVITY_OIL | 53 | | MCF_GAS | 104 |
| | Perforation Data: | | Interval Top: | 6690 ft. | # Of Holes: | 96 | | Interval Bottom: | 6897 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 6/24/2024 Interval Top: 6690 ft. Interval Bottom: 6778 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/16/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6690 ft. | # Of Holes: | 48 | | Interval Bottom: | 6778 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/16/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 03/25/2025 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|