Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30802
Well Classification: GW Status: PA - 5/21/2025
Well Name/No:IONE #6-0-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/21/2025
FacilityID:414627LocationID:317641
County:WELD #123Location:NENE 2 2N66W 6
Field:WATTENBERG - #90750Elevation:5084 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1023FNL  929 FELLat/Long: 40.171800 / -104.738300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.171797 / -104.738311Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 5/21/2025             Measured TD: 8230 ft.    Vertical TD: 8109 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 5/21/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/23/2011
Proposed Top PZ Location:Sec:2 Twp: 2N 66W Footage: 92 FNL  1286 FEL
Bottom Hole Location:Sec:2 Twp: 2N 66W Footage: 88 FNL  1299 FEL
Proposed Depth/Form:8197 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 830 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 830 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8197 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 7167 ft., Bottom: 8197 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5488 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4469 ft., Bottom: 5488 ft.

Wellbore Completed
Completion Date:7/31/2010
Spud Date:7/25/2010Spud Date Is:ACTUAL
Measured TD:8230 ft.Measured PB depth:8175 ft.
True Vertical TD:8109 ft.True Vertical PB depth:8054 ft.
Top PZ Location:Sec:2 Twp: 2N 66WFootage: 92 FNL  1286 FEL
Bottom Hole Location:Sec:2 Twp: 2N 66WFootage: 88 FNL  1299 FEL
Log Types:CBL, DUAL IND/COMPENSATED DENSITY/ COMPENSATED NEUTRON.
Log Types:CBL, DUAL IND.COMPENSATED DENSITY/COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 875 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 875 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8221 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 3900 ft., Bottom: 8221 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4644 ft.
NIOBRARA7362 ft.
CODELL7630 ft.
J SAND8076 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 5/21/2025                 Interval Top: 8076 ft.    Interval Bottom: 8138 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/27/2010
Treatment Summary:J SAND COMPLETION FRAC THE J-SAND WITH 154,056 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 248,860 # 20/40 SAND. 08-27-10
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8076 ft.# Of Holes:50
Interval Bottom:8138 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/17/2011                 Interval Top: 7416 ft.    Interval Bottom: 7640 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/27/2010
Treatment Summary:CDL-NBRR COMPLETION SET CFP @ 7730'. 08-27-10. FRAC'D THE CODELL WITH 48,258 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 4,100 # 30/50 SAND. 08/-27-10 SET CFP @ 7530'. 08-27-10. FRAC'D THE NIOBRARA WITH 136,710 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 246,300 # 30/50 SAND. 08-27-10
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7416 ft.# Of Holes:120
Interval Bottom:7640 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 9/30/2010                 Interval Top: 7416 ft.    Interval Bottom: 8138 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/27/2010
Treatment Summary:JSND-CDL-NBRR COMINGLE SET CBP @ 7350'. 09-01-10. DRILLED OUT CBP @7350', CFP @ 7350' AND CFP @ 7730' TO COMINGLE THE JSND-CDL-NBRR. 09-02-10
Tubing Size:2.375 in.Tubing Setting Depth:8052 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 127
CALC_BBLS_H2O 55
CALC_BBLS_OIL 127
CALC_GOR 3417
CALC_MCF_GAS 434
CASING_PRESS 1912
GRAVITY_OIL 50
MCF_GAS 434
TUBING_PRESS 1586
Perforation Data:
Interval Top:7416 ft.# Of Holes:200
Interval Bottom:8138 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/21/2025                 Interval Top: 7416 ft.    Interval Bottom: 7640 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/29/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:8052 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2010Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 127
BTU_GAS 1294
CALC_BBLS_H2O 55
CALC_BBLS_OIL 127
CALC_GOR 3417
CALC_MCF_GAS 434
CASING_PRESS 1912
GRAVITY_OIL 50
MCF_GAS 434
TUBING_PRESS 1586
Perforation Data:
Interval Top:7416 ft.# Of Holes:120
Interval Bottom:7640 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/19/2019                Interval Top: 7416 ft.    Interval Bottom: 7436 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/29/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/27/2010
Treatment Summary:136,710 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 246,300 #30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7416 ft.# Of Holes:80
Interval Bottom:7436 ft.Hole Size:0.7142857 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/21/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No