|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 6/10/2022 Measured TD: 7335 ft. Vertical TD: 7202 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 6/10/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/23/2011 | | Proposed Top PZ Location: | Sec:4 Twp: 4N 65W | Footage: 82 FNL 2613 FWL | | Bottom Hole Location: | Sec:4 Twp: 4N 65W | Footage: 81 FNL 2613 FWL | | Proposed Depth/Form: | 7352 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 550 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 232, Top: 0 ft., Bottom: 550 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7352 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 654, Top: , Bottom: 7352 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/11/2010 | | Spud Date: | 2/7/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7335 ft. | Measured PB depth: | 7290 ft. | | True Vertical TD: | 7202 ft. | True Vertical PB depth: | 7157 ft. | | Top PZ Location: | Sec:4 Twp: 4N 65W | Footage: 82 FNL 2613 FWL | | Bottom Hole Location: | Sec:4 Twp: 4N 65W | Footage: 81 FNL 2613 FWL | | Log Types: | CBL/GRL/CCL, CDL/CNL/ML, DIL/GLL/GRL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 618 ft., Weight: 32.00 , Citings Type: ACTUAL | | Cement: | Sacks: 535, Top: 0 ft., Bottom: 630 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7332 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 1020, Top: 1670 ft., Bottom: 7332 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4410 ft. | | | | | NIOBRARA | 6860 ft. | | | | | FORT HAYS | 7156 ft. | | | | | CODELL | 7178 ft. | | | | | GREENHORN | 7261 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 6/10/2022 Interval Top: 7181 ft. Interval Bottom: 7194 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/1/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/30/2010 | | Treatment Summary: | Frac'd Codell w/ 135352 gals of Silverstim and Slick Water with 270,640#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7181 ft. | # Of Holes: | 52 | | Interval Bottom: | 7194 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 6/10/2022 Interval Top: 6882 ft. Interval Bottom: 7194 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/1/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/30/2010 | | Treatment Summary: | Comingle Codell / Niobrara |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 27 | | BTU_GAS | 1271 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 17592 | | CALC_MCF_GAS | 475 | | CASING_PRESS | 450 | | GRAVITY_OIL | 61 | | MCF_GAS | 475 |
| | Perforation Data: | | Interval Top: | 6882 ft. | # Of Holes: | 100 | | Interval Bottom: | 7194 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/10/2022 Interval Top: 6882 ft. Interval Bottom: 7010 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/1/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/30/2010 | | Treatment Summary: | Frac'd Niobrara w/ 175176 gals of Silverstim and Slick Water with 250,360#'s of Ottawa sand.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6882 ft. | # Of Holes: | 48 | | Interval Bottom: | 7010 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 06/30/2020 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|