|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2022 Measured TD: 7453 ft. Vertical TD: 7368 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/18/2011 | | Proposed Top PZ Location: | Sec:33 Twp: 3N 65W | Footage: 75 FSL 2565 FEL | | Bottom Hole Location: | Sec:33 Twp: 3N 65W | Footage: 75 FSL 2565 FEL | | Proposed Depth/Form: | 7550 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 12/10/2009 | | Spud Date: | 12/6/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7453 ft. | Measured PB depth: | 7385 ft. | | True Vertical TD: | 7368 ft. | True Vertical PB depth: | 7300 ft. | | Top PZ Location: | Sec:33 Twp: 3N 65W | Footage: 122 FSL 2575 FEL | | Bottom Hole Location: | Sec:33 Twp: 3N 65W | Footage: 122 FSL 2575 FEL | | Log Types: | CBL/GR/CCL, CDL/CNL/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 732 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 732 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7430 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 1830 ft., Bottom: 7430 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6958 ft. | | N | N | | FORT HAYS | 7240 ft. | | N | N | | CODELL | 7263 ft. | | N | N | | GREENHORN | 7354 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 2/5/2010 Interval Top: 7265 ft. Interval Bottom: 7279 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/26/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2010 | | Treatment Summary: | FRACD CODELL WITH 131712 GALS OF VISTAR AND SLICK WATER WITH 268505 #S OF OTTAWA SAND. CODELL IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7265 ft. | # Of Holes: | 56 | | Interval Bottom: | 7279 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 7024 ft. Interval Bottom: 7279 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2010 | | Treatment Summary: | COMMINGLE CODELL/NIOBRARA |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/5/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 147 | | BTU_GAS | 1371 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 147 | | CALC_GOR | 2748 | | CALC_MCF_GAS | 404 | | CASING_PRESS | 1050 | | GRAVITY_OIL | 53 | | MCF_GAS | 404 |
| | Perforation Data: | | Interval Top: | 7024 ft. | # Of Holes: | 104 | | Interval Bottom: | 7279 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/5/2010 Interval Top: 7024 ft. Interval Bottom: 7132 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/26/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2010 | | Treatment Summary: | FRACD NIOBRARA WITH 186606 GALS OF VISTAR AND SLICK WATER WITH 296610 #S OF OTTAWA SAND. NIOBRARA IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7024 ft. | # Of Holes: | 48 | | Interval Bottom: | 7132 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 04/30/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|