|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/17/2020 Measured TD: 7670 ft. Vertical TD: 7467 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/17/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/17/2011 | | Proposed Top PZ Location: | Sec:7 Twp: 3N 66W | Footage: 1230 FSL 50 FWL | | Bottom Hole Location: | Sec:7 Twp: 3N 66W | Footage: 1230 FSL 50 FWL | | Proposed Depth/Form: | 7693 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7693 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7693 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/29/2010 | | Spud Date: | 1/26/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7670 ft. | Measured PB depth: | 7626 ft. | | True Vertical TD: | 7467 ft. | True Vertical PB depth: | 7423 ft. | | Top PZ Location: | Sec:7 Twp: 3N 66W | Footage: 1190 FSL 49 FWL | | Bottom Hole Location: | Sec:7 Twp: 3N 66W | Footage: 1189 FSL 48 FWL | | Log Types: | P/E AILC-CNDL-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 921 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7660 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 865, Top: 670 ft., Bottom: 7660 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3958 ft. | 4055 ft. | | | | SUSSEX | 4396 ft. | 4704 ft. | | | | SHANNON | 4974 ft. | 5036 ft. | | | | TEEPEE BUTTES | 6375 ft. | 6379 ft. | | | | NIOBRARA | 7219 ft. | | | | | FORT HAYS | 7487 ft. | | | | | CODELL | 7508 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 3/23/2020 Interval Top: 7238 ft. Interval Bottom: 7528 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/20/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/17/2010 | | Treatment Summary: | NB PERF 7238-7374 HOLES 62 SIZE 0.42. CD PERF 7512-7528 HOLES 64 SIZE 0.40. FRAC NB W/ 500 GAL 15% HCL AND 240357 GAL SW W/ 200280# 40/70 AND 4000# 20/40 SB EXCEL. FRAC CD W/ 212115 GAL SW W/ 150080# 40/70 AND 4000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/7/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1234 | | CALC_BBLS_OIL | 90 | | CALC_GOR | 6856 | | CALC_MCF_GAS | 617 | | CASING_PRESS | 3300 | | GRAVITY_OIL | 61 |
| | Perforation Data: | | Interval Top: | 7238 ft. | # Of Holes: | 126 | | Interval Bottom: | 7528 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/23/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|