|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 4/11/2025 Measured TD: 8020 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 4/11/2025 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 11/12/2011 | | Proposed Depth/Form: | 7929 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 530 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 224, Top: 0 ft., Bottom: 530 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7929 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 758, Top: , Bottom: 7929 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/26/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8020 ft. | Measured PB depth: | 7952 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/GR/CCL/VDL (run 1), CBL/GR/CCL/VDL (run 2), Neutron/Density/Microlog, DIL/GL/GR | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 603 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 264, Top: 0 ft., Bottom: 603 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7997 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6692 ft., Bottom: 7997 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1200 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 448 ft., Bottom: 1225 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5588 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 1610 ft., Bottom: 5630 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7060 ft. | | | | | FORT HAYS | 7324 ft. | | | | | CODELL | 7347 ft. | | | | | J SAND | 7770 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/11/2025 Interval Top: 7772 ft. Interval Bottom: 7810 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/17/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | J-Sand producing through cast iron flow through plugs
Frac'd J-Sand w/ 145789 gals Vistar and Slick Water with 280580 lbs Ottawa sand and SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7772 ft. | # Of Holes: | 112 | | Interval Bottom: | 7810 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 12/16/2010 Interval Top: 7350 ft. Interval Bottom: 7365 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/17/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/16/2010 | | Treatment Summary: | Codell producing through cast iron flow through plugs
Frac'd Codell w/ 133822 gals Vistar, Acid, and Slick Water with 269480 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7350 ft. | # Of Holes: | 60 | | Interval Bottom: | 7365 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/25/2010 Interval Top: 7132 ft. Interval Bottom: 7810 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/17/2010 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | Codell, Niobrara, and J-Sand commingled |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/25/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 65 | | BTU_GAS | 1265 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 2307 | | CALC_MCF_GAS | 150 | | CASING_PRESS | 700 | | GRAVITY_OIL | 52 | | MCF_GAS | 150 |
| | Perforation Data: | | Interval Top: | 7132 ft. | # Of Holes: | 216 | | Interval Bottom: | 7810 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/16/2010 Interval Top: 7132 ft. Interval Bottom: 7210 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/17/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/16/2010 | | Treatment Summary: | Frac'd Niobrara w/ 174595 gals Vistar and Slick Water with 249500 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7132 ft. | # Of Holes: | 48 | | Interval Bottom: | 7210 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/11/2025| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/16/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/11/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|