Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30700
Well Classification: GW Status: PA - 1/27/2020
Well Name/No:ROCKY #23-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/27/2020
FacilityID:414226LocationID:327782
County:WELD #123Location:SESW 1 3N66W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:594FSL  2078 FWLLat/Long: 40.248490 / -104.727410Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.248499 / -104.727411Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/24/2020             Measured TD: 7663 ft.    Vertical TD: 7551 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/24/2020
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:10/13/2011
Proposed Top PZ Location:Sec:1 Twp: 3N 66W Footage: 1361 FSL  2620 FEL
Bottom Hole Location:Sec:1 Twp: 3N 66W Footage: 1361 FSL  2620 FEL
Proposed Depth/Form:7652 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:12/16/2009
Spud Date:12/13/2009Spud Date Is:ACTUAL
Measured TD:7663 ft.Measured PB depth:7622 ft.
True Vertical TD:7551 ft.True Vertical PB depth:7510 ft.
Top PZ Location:Sec:1 Twp: 3N 66WFootage: 1361 FSL  2620 FEL
Bottom Hole Location:Sec:1 Twp: 3N 66WFootage: 1361 FSL  2620 FEL
Log Types:CD-CN-ML, DI-GL-GR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 678 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 678 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7654 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 948, Top: 0 ft., Bottom: 7654 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3958 ft.4185 ft.NN
SUSSEX4613 ft.4730 ft.NN
NIOBRARA7181 ft.NN
FORT HAYS7454 ft.NN
CODELL7476 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/25/2010                 Interval Top: 7478 ft.    Interval Bottom: 7492 ft.

 Completed Information for Formation CODELL
1st Production Date:2/3/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2010
Treatment Summary:195,195 GALS FLUID & 150,660 LBWS 40/70 SAND & 4,000 LBS 20/40 SUPER LC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7478 ft.# Of Holes:56
Interval Bottom:7492 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/27/2020                 Interval Top: 7198 ft.    Interval Bottom: 7492 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/3/2010Choke Size:0.375 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/8/2010
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/25/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1221
CALC_BBLS_H2O 0
CALC_BBLS_OIL 10
CALC_GOR 43500
CALC_MCF_GAS 435
CASING_PRESS 280
GRAVITY_OIL 51
Perforation Data:
Interval Top:7198 ft.# Of Holes:122
Interval Bottom:7492 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/25/2010                 Interval Top: 7198 ft.    Interval Bottom: 7366 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/3/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/8/2010
Treatment Summary:500 GALS ACID & 235,666 GALS FLUID & 200,320 LABE 40/70 SAND & 4,000 LBS 20/40 SUPER LC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7198 ft.# Of Holes:66
Interval Bottom:7366 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/27/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No