|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/30/2020 Measured TD: 8035 ft. Vertical TD: 7979 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/30/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/13/2011 | | Proposed Top PZ Location: | Sec:8 Twp: 3N 66W | Footage: 1255 FSL 1414 FWL | | Bottom Hole Location: | Sec:8 Twp: 3N 66W | Footage: 1255 FSL 1414 FWL | | Proposed Depth/Form: | 8004 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 2/14/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8035 ft. | Measured PB depth: | 7989 ft. | | True Vertical TD: | 7979 ft. | True Vertical PB depth: | 7933 ft. | | Top PZ Location: | Sec:8 Twp: 3N 66W | Footage: 1255 FSL 1414 FWL | | Bottom Hole Location: | Sec:8 Twp: 3N 66W | Footage: 1255 FSL 1414 FWL | | Log Types: | P/E AILC-CNLD-ML, CBL-GR-CCL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 594 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 594 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8026 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 970, Top: 1110 ft., Bottom: 8026 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 970 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 412 ft., Bottom: 970 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3920 ft. | 4000 ft. | N | N | | SUSSEX | 4363 ft. | 4700 ft. | N | N | | SHANNON | 4970 ft. | 5060 ft. | N | N | | NIOBRARA | 7158 ft. | | N | N | | FORT HAYS | 7406 ft. | | N | N | | CODELL | 7428 ft. | | N | N | | J SAND | 7867 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 4/3/2010 Interval Top: 7430 ft. Interval Bottom: 7446 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/10/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/22/2010 | | Treatment Summary: | 204,345 GALS FLUID & 150/120 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7430 ft. | # Of Holes: | 64 | | Interval Bottom: | 7446 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/31/2020 Interval Top: 7166 ft. Interval Bottom: 7446 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/10/2010 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2010 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/3/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1234 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 10955 | | CALC_MCF_GAS | 482 | | CASING_PRESS | 2950 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 0 | | Interval Bottom: | 7446 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/3/2010 Interval Top: 7166 ft. Interval Bottom: 7306 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/10/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2010 | | Treatment Summary: | 500 GALS ACID & 255,381 GALS FLUID & 200,240 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 78 | | Interval Bottom: | 7306 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/31/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|