|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/11/2019 Measured TD: 8100 ft. Vertical TD: 7907 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/11/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/28/2011 | Proposed Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 2130 FNL 2130 FEL | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 2130 FNL 2130 FEL | Proposed Depth/Form: | 8049 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE |
| | |
Wellbore Completed | Completion Date: | 2/25/2010 | Spud Date: | 2/22/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8100 ft. | Measured PB depth: | 8048 ft. | True Vertical TD: | 7907 ft. | True Vertical PB depth: | 7855 ft. | Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 2115 FNL 2140 FEL | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 2115 N 2140 E | Log Types: | CN/CD/ML, DIL, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 882 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 882 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8086 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 2100 ft., Bottom: 8086 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4142 ft. | 4330 ft. | N | N | SUSSEX | 4544 ft. | 4750 ft. | N | N | SHANNON | 5130 ft. | 5160 ft. | N | N | NIOBRARA | 7534 ft. | | N | N | FORT HAYS | 7806 ft. | | N | N | CODELL | 7827 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/22/2014 Interval Top: 7828 ft. Interval Bottom: 7848 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/21/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/23/2013 | Treatment End Date: | 10/23/2013 | Treatment Summary: | Re-frac Codell w/150,040# 40/70, 4,000# Super LC and 4735 bbl SW
*85 bbls flowback recovered before well died and pep. for swabbing | Total fluid used in treatment (bbls): | 4735 | Max pressure during treatment (psi): | 4816 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 85 | Fresh water used in treatment (bbls): | 4735 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 154040 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 3/25/2010 | Treatment Summary: | 202,314 GALS FLUID & 150,980# 40/70 SAND & 4,300# 20/40 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7828 ft. | # Of Holes: | 60 | Interval Bottom: | 7848 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/11/2019 Interval Top: 7535 ft. Interval Bottom: 7848 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/19/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/29/2010 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7792 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/12/2014 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | BTU_GAS | 1227 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 2 | CALC_GOR | 18750 | CALC_MCF_GAS | 42 | CASING_PRESS | 225 | GRAVITY_OIL | 50 | MCF_GAS | 42 | TUBING_PRESS | 174 |
| Perforation Data: | Interval Top: | 7535 ft. | # Of Holes: | 142 | Interval Bottom: | 7848 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/27/2010 Interval Top: 7535 ft. Interval Bottom: 7712 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/21/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/29/2010 | Treatment Summary: | 500 GALS ACID & 245,826 GALS FLUID & 200,260# 40/70 SAND & 4,120# 20/40 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7535 ft. | # Of Holes: | 82 | Interval Bottom: | 7712 ft. | Hole Size: | 0.47 in. |
|
|
|
|
|
Reported Plugged | Y | 07/11/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|