Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30678
Well Classification: OW Status: PA - 7/11/2019
Well Name/No:NELSON #21-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/11/2019
FacilityID:413343LocationID:318241
Municipality/County:FREDERICK / WELD #123Location:NWNE 35 2N68W 6
Field:WATTENBERG - #90750Elevation:4948 ft.
Planned Location:740FNL  1812 FELLat/Long: 40.100250 / -104.967500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.100263 / -104.967508Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/23/2013
End Date: 10/23/2013
Reported: 12/9/2013
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/11/2019             Measured TD: 7900 ft.    Vertical TD: 7797 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/11/2019
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:9/28/2011
Proposed Top PZ Location:Sec:35 Twp: 2N 68W Footage: 1300 FNL  2600 FEL
Bottom Hole Location:Sec:35 Twp: 2N 68W Footage: 1300 FNL  2600 FEL
Proposed Depth/Form:7893 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:3/1/2010
Spud Date:2/26/2010Spud Date Is:ACTUAL
Measured TD:7900 ft.Measured PB depth:7842 ft.
True Vertical TD:7797 ft.True Vertical PB depth:7739 ft.
Top PZ Location:Sec:35 Twp: 2N 68WFootage: 1290 FNL  2593 FEL
Bottom Hole Location:Sec:35 Twp: 2N 68WFootage: 1290 N  2593 E
Log Types:CD-CN-ML, DI-GL-GR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 886 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 886 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7880 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 725, Top: 1560 ft., Bottom: 7880 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2700 ft.3050 ft.NN
PARKMAN4104 ft.4238 ft.NN
SUSSEX4618 ft.4738 ft.NN
SHANNON5062 ft.5160 ft.NN
NIOBRARA7439 ft.NN
FORT HAYS7708 ft.NN
CODELL7728 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/24/2014                 Interval Top: 7730 ft.    Interval Bottom: 7750 ft.

 Completed Information for Formation CODELL
1st Production Date:4/19/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/23/2013Treatment End Date:10/23/2013
Treatment Summary:REFRAC CODELL WITH 4709 BBL SLICKWATER 150,220# 40/70 SAND,4000# SUPER LC SAND
Total fluid used in treatment (bbls):4709Max pressure during treatment (psi):5137
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):258
Fresh water used in treatment (bbls):4709Disposition method For flowback:RECYCLE
Total proppant used (lbs):154220Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/31/2010
Treatment Summary:200,256 GALS FLUID & 150,240# 40/70 SAND & 4180# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7730 ft.# Of Holes:60
Interval Bottom:7750 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/11/2019                 Interval Top: 7440 ft.    Interval Bottom: 7750 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/19/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/1/2010
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7683 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/9/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 10
BTU_GAS 1299
CALC_BBLS_H2O 0
CALC_BBLS_OIL 10
CALC_GOR 5161
CALC_MCF_GAS 53
CASING_PRESS 885
GRAVITY_OIL 49
MCF_GAS 53
TUBING_PRESS 594
Perforation Data:
Interval Top:7440 ft.# Of Holes:120
Interval Bottom:7750 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/21/2010                 Interval Top: 7440 ft.    Interval Bottom: 7616 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/19/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2010
Treatment Summary:500 GALS ACID & 241,164 GALS FLUID & 200,320# 40/70 SAND & 4140# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7440 ft.# Of Holes:60
Interval Bottom:7616 ft.Hole Size:0.47 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/11/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No