|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/10/2019 Measured TD: 8213 ft. Vertical TD: 8204 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/10/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/14/2013 | Proposed Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 585 FNL 1819 FEL | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 581 FNL 1830 FEL | Proposed Depth/Form: | 8213 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 885 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 56, Top: 0 ft., Bottom: 885 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8203 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 450, Top: 4190 ft., Bottom: 8203 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4008 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 510, Top: 385 ft., Bottom: 8203 ft. |
| | |
Wellbore Completed | Completion Date: | 2/17/2010 | Spud Date: | 2/13/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8213 ft. | Measured PB depth: | 4059 ft. | True Vertical TD: | 8204 ft. | True Vertical PB depth: | 4049 ft. | Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 585 FNL 1819 FEL | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 585 N 1819 E | Log Types: | AC-TRL, BVP, SP-DSN-AC-TRL, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 885 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 885 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8203 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 4180 ft., Bottom: 8203 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4008 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 510, Top: 385 ft., Bottom: 4052 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4034 ft. | 4315 ft. | N | N | SUSSEX | 4539 ft. | 4644 ft. | N | N | SHANNON | 4978 ft. | 5007 ft. | N | N | NIOBRARA | 7332 ft. | | N | N | FORT HAYS | 7603 ft. | | N | N | CODELL | 7624 ft. | | N | N | J SAND | 8055 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 7/10/2019 Interval Top: 8065 ft. Interval Bottom: 8087 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/8/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/14/2012 | Treatment Summary: | Frac JSND down casing w/ 163,926 gal slickwater w/ 160,260# 40/70, 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8065 ft. | # Of Holes: | 60 | Interval Bottom: | 8087 ft. | Hole Size: | 0.43 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/3/2012 Interval Top: 7624 ft. Interval Bottom: 7644 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/21/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/31/2010 | Treatment Summary: | 202957 GALS FLUID AND 150900# 40/70 SAND AND 4140# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7624 ft. | # Of Holes: | 60 | Interval Bottom: | 7644 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/19/2012 Interval Top: 7332 ft. Interval Bottom: 8087 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/8/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/14/2012 | Treatment Summary: | JSND REC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/19/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 11 | BTU_GAS | 1382 | CALC_BBLS_OIL | 11 | CALC_GOR | 12000 | CALC_MCF_GAS | 132 | CASING_PRESS | 1420 | GRAVITY_OIL | 50 | MCF_GAS | 132 |
| Perforation Data: | Interval Top: | 7332 ft. | # Of Holes: | 186 | Interval Bottom: | 8087 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/10/2019 Interval Top: 7332 ft. Interval Bottom: 7644 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/21/2010 | Choke Size: | 0.156 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/5/2010 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/27/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1244 | CALC_BBLS_OIL | 6 | CALC_GOR | 3167 | CALC_MCF_GAS | 19 | CASING_PRESS | 1500 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7332 ft. | # Of Holes: | 126 | Interval Bottom: | 7644 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/3/2012 Interval Top: 7332 ft. Interval Bottom: 7508 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/21/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/5/2010 | Treatment Summary: | 500 GALS ACID AND 253445 GALS FLUID AND 201560# 40/70 SAND AND 4060# 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7332 ft. | # Of Holes: | 66 | Interval Bottom: | 7508 ft. | Hole Size: | 0.47 in. |
|
|
|
|
|
Reported Plugged | Y | 07/10/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|