|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/10/2019 Measured TD: 8556 ft. Vertical TD: 8199 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/10/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/13/2013 | | Proposed Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 1381 FNL 61 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 1374 FNL 60 FEL | | Proposed Depth/Form: | 8556 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8536 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 255, Top: 4446 ft., Bottom: 8536 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4375 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 1303 ft., Bottom: 4375 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/9/2010 | | Spud Date: | 2/4/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8556 ft. | Measured PB depth: | 8517 ft. | | True Vertical TD: | 8199 ft. | True Vertical PB depth: | 8160 ft. | | Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 1381 FNL 61 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 1381 FNL 61 FEL | | Log Types: | NO OH LOGS - EQUIPMENT FAILED, CBL, DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 880 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8536 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 435, Top: 4442 ft., Bottom: 8536 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4375 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 1310 ft., Bottom: 4375 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4373 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 1304 ft., Bottom: 4420 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4313 ft. | | N | N | | SUSSEX | 4780 ft. | 5050 ft. | N | N | | SHANNON | 5320 ft. | | N | N | | NIOBRARA | 7684 ft. | | N | N | | FORT HAYS | 7962 ft. | | N | N | | CODELL | 7982 ft. | | N | N | | J SAND | 8421 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 7/10/2019 Interval Top: 8422 ft. Interval Bottom: 8444 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/21/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/24/2012 | | Treatment Summary: | Frac JSND down casing w/ 164,430 gal slickwater w/ 160,440# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8422 ft. | # Of Holes: | 60 | | Interval Bottom: | 8444 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/23/2012 Interval Top: 7993 ft. Interval Bottom: 8013 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/21/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/18/2010 | | Treatment Summary: | 199,025 GALS FLUID & 150,040# 40/70 SAND & 4100# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7993 ft. | # Of Holes: | 60 | | Interval Bottom: | 8013 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 3/2/2012 Interval Top: 7692 ft. Interval Bottom: 8444 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/21/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/24/2012 | | Treatment Summary: | JSND REC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/2/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1382 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 35750 | | CALC_MCF_GAS | 143 | | CASING_PRESS | 1461 | | GRAVITY_OIL | 50 | | MCF_GAS | 143 |
| | Perforation Data: | | Interval Top: | 7692 ft. | # Of Holes: | 186 | | Interval Bottom: | 8444 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/10/2019 Interval Top: 7692 ft. Interval Bottom: 8013 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/21/2010 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/19/2010 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/27/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1241 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 2940 | | CALC_MCF_GAS | 97 | | CASING_PRESS | 950 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7692 ft. | # Of Holes: | 126 | | Interval Bottom: | 8013 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/23/2012 Interval Top: 7692 ft. Interval Bottom: 7872 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/21/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/19/2010 | | Treatment Summary: | 500 GALS ACID & 240,605 GALS FLUID & 200,780# 40/70 SAND & 4060# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7692 ft. | # Of Holes: | 66 | | Interval Bottom: | 7872 ft. | Hole Size: | 0.47 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/10/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|