|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/2/2024 Measured TD: 8400 ft. Vertical TD: 8216 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/2/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20092632 | Expiration Date: | 9/20/2011 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 2159 FSL 1939 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 2166 FSL 1941 FEL | | Proposed Depth/Form: | 8360 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8360 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7295 ft., Bottom: 8360 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5326 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4336 ft., Bottom: 5326 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/1/2010 | | Spud Date: | 2/23/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8300 ft. | | True Vertical TD: | 8216 ft. | True Vertical PB depth: | 8116 ft. | | Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 2159 FSL 1939 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 2166 FSL 1941 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 857 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 857 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8382 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 80 ft., Bottom: 8382 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 5058 ft. | | | | | NIOBRARA | 7463 ft. | | | | | CODELL | 7770 ft. | | | | | J SAND | 8196 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/2/2024 Interval Top: 8208 ft. Interval Bottom: 8226 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2010 | | Treatment Summary: | J SAND COMPLETION: FRAC THE J-SAND 8208'-8226' (36 HOLES) W/ 153,678 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,560# 20/40 SAND 04-05-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8208 ft. | # Of Holes: | 36 | | Interval Bottom: | 8226 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 11/16/2023 Interval Top: 7770 ft. Interval Bottom: 7790 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 40 | | Interval Bottom: | 7790 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/30/2010 Interval Top: 7542 ft. Interval Bottom: 8226 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/29/2010 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/5/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE: SET CBP @ 7430'. 4-12-10. DRILLED OUT CBP@ 7430' 04-13-10. DRILLED OUT CFP @ 7630' AND 7880' TO COMMINGE THE JSND-NBRR-CODL. 4-14-10 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8183 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/30/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 253 | | BBLS_OIL | 45 | | BTU_GAS | 1249 | | CALC_BBLS_H2O | 253 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 5622 | | CALC_MCF_GAS | 253 | | CASING_PRESS | 1732 | | GRAVITY_OIL | 49 | | MCF_GAS | 253 | | TUBING_PRESS | 1052 |
| | Perforation Data: | | Interval Top: | 7542 ft. | # Of Holes: | 156 | | Interval Bottom: | 8226 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/2/2024 Interval Top: 7542 ft. Interval Bottom: 7790 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2010 | | Treatment Summary: | NBRR-CDL COMPLETION: SET CFP @ 7880'. FRAC'D THE CODELL 7770'-7790' (40 HOLES) W/ 108,654 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,380# 20/40 SAND. 04-05-10. SET CFP @ 7630'. 04-05-10. FRAC'D THE NIOBRARA 7542' - 7562' (80 HOLES), W/ 132,384 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,300# 20/40 SAND. 04-05-10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7542 ft. | # Of Holes: | 120 | | Interval Bottom: | 7790 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 11/16/2023 Interval Top: 7542 ft. Interval Bottom: 7562 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7542 ft. | # Of Holes: | 80 | | Interval Bottom: | 7562 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/02/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|