|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 8145 ft. Vertical TD: 8054 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20092487 | Expiration Date: | 8/21/2011 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 2553 FSL 118 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 2575 FSL 102 FEL | | Proposed Depth/Form: | 8103 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8103 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7063 ft., Bottom: 8103 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5179 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4203 ft., Bottom: 5179 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/16/2010 | | Spud Date: | 7/12/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8145 ft. | Measured PB depth: | 8068 ft. | | True Vertical TD: | 8054 ft. | True Vertical PB depth: | 7977 ft. | | Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 2553 FSL 118 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 2575 FSL 102 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 823 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 0 ft., Bottom: 823 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8129 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 3550 ft., Bottom: 8129 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4440 ft. | | | | | NIOBRARA | 7292 ft. | | | | | CODELL | 7552 ft. | | | | | J SAND | 7982 ft. | | | |
Formation JNBCD Formation Classification: GW Status: CM - 8/11/2010 Interval Top: 7982 ft. Interval Bottom: 8016 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/29/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE
SET CBP @ 7260 8/3/10. DRILLED OUT CBP @ 7260, CFP @ 7460 AND CFP @ 7670 TO COMMINGLE THE JSND-NBRR-CDL 8/4/10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7946 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/11/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 60 | | BBLS_OIL | 76 | | BTU_GAS | 1213 | | CALC_BBLS_H2O | 60 | | CALC_BBLS_OIL | 76 | | CALC_GOR | 2816 | | CALC_MCF_GAS | 214 | | CASING_PRESS | 1634 | | GRAVITY_OIL | 49 | | MCF_GAS | 214 | | TUBING_PRESS | 854 |
| | Perforation Data: | | Interval Top: | 7982 ft. | # Of Holes: | 160 | | Interval Bottom: | 8016 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7982 ft. Interval Bottom: 8016 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/29/2010 | | Treatment Summary: | J SAND COMPLETION
FRAC THE J-SAND WITH 155,022 GAL 18# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,780 # 20/40 SAND 7/29/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7982 ft. | # Of Holes: | 56 | | Interval Bottom: | 8016 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7338 ft. Interval Bottom: 7572 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/29/2010 | | Treatment Summary: | NBRR-CDL COMPLETION
SET CFP @ 7670 7/29/10. FRAC'D CODELL WITH 109956 GAL 22# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 251,340 # 20/40 SAND. 7/29/10.
SET CFP @ 7460 7/29/10 FRAC'D THE NIOBRARA WITH 140,280 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 251,120 # 20/40 SAND. 7/29/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7338 ft. | # Of Holes: | 104 | | Interval Bottom: | 7572 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 214 |
| Total Gas Produced (MCF) | 5554 |
| GOR | 25953 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.389 |
| Average MCFE per Day | 19.674 |
| Federal Financial Assurance | i | |
|
|