Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30571
Well Classification: OW Status: PA - 8/4/2017
Well Name/No:ADAM FARM #2-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/4/2017
FacilityID:412877LocationID:318150
Municipality/County:FIRESTONE / WELD #123Location:SWNE 4 2N68W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Planned Location:1312FNL  1600 FELLat/Long: 40.171360 / -105.004110Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.171370 / -105.004116Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/4/2017             Measured TD: 7590 ft.    Vertical TD: 7519 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/4/2017
Wellbore PermitDIRECTIONAL
Permit #:20092460 Expiration Date:7/27/2011
Proposed Top PZ Location:Sec:4 Twp: 2N 68W Footage: 627 FNL  2016 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68W Footage: 627 FNL  2016 FEL
Proposed Depth/Form:7499 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NE

Wellbore Completed
Completion Date:10/13/2009
Spud Date:10/10/2009Spud Date Is:ACTUAL
Measured TD:7590 ft.Measured PB depth:7539 ft.
True Vertical TD:7519 ft.True Vertical PB depth:7468 ft.
Top PZ Location:Sec:4 Twp: 2N 68WFootage: 627 FNL  2016 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68WFootage: 627 FNL  2016 FEL
Log Types:DI-GL-GR, CD-CN-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 969 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 0 ft., Bottom: 969 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7575 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 911, Top: 516 ft., Bottom: 7575 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3633 ft.NN
SUSSEX4053 ft.NN
SHANNON4639 ft.NN
NIOBRARA7104 ft.NN
FORT HAYS7390 ft.NN
CODELL7410 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/26/2010                 Interval Top: 7413 ft.    Interval Bottom: 7433 ft.

 Completed Information for Formation CODELL
1st Production Date:2/3/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/18/2009
Treatment Summary:197,847 GALS FLUID & 150,660 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7413 ft.# Of Holes:60
Interval Bottom:7433 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/4/2017                  Interval Top: 7150 ft.    Interval Bottom: 7433 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/3/2010Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/19/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/26/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1356
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 4889
CALC_MCF_GAS 44
CASING_PRESS 800
GRAVITY_OIL 51
Perforation Data:
Interval Top:7150 ft.# Of Holes:132
Interval Bottom:7433 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/26/2010                 Interval Top: 7150 ft.    Interval Bottom: 7290 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/8/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/19/2009
Treatment Summary:500 GALS ACID & 241,338 GALS FLUID & 200,380 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7150 ft.# Of Holes:72
Interval Bottom:7290 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/04/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No