Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30569
Well Classification: OW Status: PA - 9/26/2024
Well Name/No:ADAM FARM #1-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/26/2024
FacilityID:412875LocationID:318150
Municipality/County:FIRESTONE / WELD #123Location:SWNE 4 2N68W 6
Field:WATTENBERG - #90750Elevation:4884 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1340FNL  1587 FELLat/Long: 40.171280 / -105.004060Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.171280 / -105.004061Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/26/2024             Measured TD: 8125 ft.    Vertical TD: 7964 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/26/2024
Wellbore PermitDIRECTIONAL
Permit #:20092464 Expiration Date:7/27/2011
Proposed Top PZ Location:Sec:4 Twp: 2N 68W Footage: 624 FNL  679 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68W Footage: 624 FNL  679 FEL
Proposed Depth/Form:8018 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NE

Wellbore Completed
Completion Date:10/3/2009
Spud Date:9/30/2009Spud Date Is:ACTUAL
Measured TD:8125 ft.Measured PB depth:8088 ft.
True Vertical TD:7964 ft.True Vertical PB depth:7927 ft.
Top PZ Location:Sec:4 Twp: 2N 68WFootage: 624 FNL  679 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68WFootage: 624 FNL  679 FEL
Log Types:P/E AILC-CNLD-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 974 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 974 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8108 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 204, Top: 6686 ft., Bottom: 8108 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5217 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 559, Top: 1280 ft., Bottom: 5248 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3726 ft.NN
SUSSEX4284 ft.NN
SHANNON4755 ft.NN
NIOBRARA7239 ft.NN
FORT HAYS7493 ft.NN
CODELL7513 ft.NN
J SAND7955 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/25/2010                 Interval Top: 7513 ft.    Interval Bottom: 7529 ft.

 Completed Information for Formation CODELL
1st Production Date:1/6/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/9/2009
Treatment Summary:203,495 GALS FLUID & 150,260 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7513 ft.# Of Holes:64
Interval Bottom:7529 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/26/2024                 Interval Top: 7252 ft.    Interval Bottom: 7529 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/6/2010Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/10/2010
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/25/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1433
CALC_BBLS_H2O 0
CALC_BBLS_OIL 93
CALC_GOR 2366
CALC_MCF_GAS 220
CASING_PRESS 1400
GRAVITY_OIL 50
TUBING_PRESS 0
Perforation Data:
Interval Top:7252 ft.# Of Holes:136
Interval Bottom:7529 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/25/2010                 Interval Top: 7252 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/6/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/10/2009
Treatment Summary:500 GALS ACID & 245,642 GALS FLUID & 200,440 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7252 ft.# Of Holes:72
Interval Bottom:7392 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/26/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No