|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/26/2024 Measured TD: 7635 ft. Vertical TD: 7545 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/26/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20092463 | Expiration Date: | 7/27/2011 | | Proposed Top PZ Location: | Sec:4 Twp: 2N 68W | Footage: 1288 FNL 2574 FEL | | Bottom Hole Location: | Sec:4 Twp: 2N 68W | Footage: 1288 FNL 2574 FEL | | Proposed Depth/Form: | 7618 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 10/6/2009 | | Spud Date: | 10/4/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7635 ft. | Measured PB depth: | 7584 ft. | | True Vertical TD: | 7545 ft. | True Vertical PB depth: | 7494 ft. | | Top PZ Location: | Sec:4 Twp: 2N 68W | Footage: 1288 FNL 2574 FEL | | Bottom Hole Location: | Sec:4 Twp: 2N 68W | Footage: 1288 FNL 2574 FEL | | Log Types: | CD-CN-ML, DI-GL-GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 971 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 356, Top: 0 ft., Bottom: 971 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7620 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 864, Top: 1080 ft., Bottom: 7620 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2608 ft. | | N | N | | PARKMAN | 3680 ft. | | N | N | | SUSSEX | 4206 ft. | | N | N | | SHANNON | 4642 ft. | | N | N | | NIOBRARA | 7159 ft. | | N | N | | FORT HAYS | 7412 ft. | | N | N | | CODELL | 7433 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/25/2010 Interval Top: 7435 ft. Interval Bottom: 7455 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/7/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/11/2009 | | Treatment Summary: | 205,713 GALS FLUID & 151,820 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7435 ft. | # Of Holes: | 60 | | Interval Bottom: | 7455 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/26/2024 Interval Top: 7172 ft. Interval Bottom: 7455 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/7/2010 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/13/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/25/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1235 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 84 | | CALC_GOR | 2334 | | CALC_MCF_GAS | 196 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 132 | | Interval Bottom: | 7455 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/25/2010 Interval Top: 7172 ft. Interval Bottom: 7302 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/7/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/13/2009 | | Treatment Summary: | 518 GALS ACID & 245,850 GALS FLUID & 200,420 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 72 | | Interval Bottom: | 7302 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/26/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|