Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30400
Well Classification: OW Status: PA - 3/25/2020
Well Name/No:WEICHEL #39-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/25/2020
FacilityID:412148LocationID:305715
County:WELD #123Location:SESE 14 2N65W 6
Field:WATTENBERG - #90750Elevation:4877 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:467FSL  518 FELLat/Long: 40.132540 / -104.623460Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.132553 / -104.623465Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 3/25/2020             Measured TD: 7440 ft.    Vertical TD: 7337 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 3/25/2020
Wellbore PermitDIRECTIONAL
Permit #:20091627 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec:14 Twp: 2N 65W Footage: 1314 FSL  71 FEL
Bottom Hole Location:Sec:14 Twp: 2N 65W Footage: 1314 FSL  71 FEL
Proposed Depth/Form:7402 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:1/2/2010
Spud Date:12/29/2009Spud Date Is:ACTUAL
Measured TD:7440 ft.Measured PB depth:7388 ft.
True Vertical TD:7337 ft.True Vertical PB depth:7285 ft.
Top PZ Location:Sec:14 Twp: 2N 65WFootage: 1314 FSL  71 FEL
Bottom Hole Location:Sec:14 Twp: 2N 65WFootage: 1314 FSL  71 FEL
Log Types:NO O/H LOGS RUN, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 856 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 856 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7422 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 840 ft., Bottom: 7422 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6930 ft.NN
FORT HAYS7204 ft.NN
CODELL7227 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/24/2010                 Interval Top: 7230 ft.    Interval Bottom: 7248 ft.

 Completed Information for Formation CODELL
1st Production Date:2/1/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/13/2010
Treatment Summary:208,190 GALS FLUID & 150,060# 40/70SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7230 ft.# Of Holes:54
Interval Bottom:7248 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/25/2020                 Interval Top: 6983 ft.    Interval Bottom: 7248 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/1/2010Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2010
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/24/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1270
CALC_BBLS_OIL 31
CALC_GOR 3452
CALC_MCF_GAS 107
CASING_PRESS 900
GRAVITY_OIL 50
Perforation Data:
Interval Top:6983 ft.# Of Holes:120
Interval Bottom:7248 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/24/2010                 Interval Top: 6983 ft.    Interval Bottom: 7098 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/1/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2010
Treatment Summary:250,257 GALS FLUID & 200,740 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6983 ft.# Of Holes:66
Interval Bottom:7098 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/25/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No