|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/30/2018 Measured TD: 7865 ft. Vertical TD: 7726 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/30/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | 20091625 | Expiration Date: | 5/6/2010 | Proposed Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 652 FNL 1974 FEL | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 652 FNL 1974 FEL | Proposed Depth/Form: | 7889 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2NE |
| | |
Wellbore Completed | Completion Date: | 7/24/2009 | Spud Date: | 7/19/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7865 ft. | Measured PB depth: | 7818 ft. | True Vertical TD: | 7726 ft. | True Vertical PB depth: | 7679 ft. | Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 652 FNL 1974 FEL | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 652 FNL 1974 FEL | Log Types: | OH LOGS BRIDGED OUT AT 4400, PNN, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7856 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 6350 ft., Bottom: 7856 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4955 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: 1160 ft., Bottom: 4990 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4955 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 1150 ft., Bottom: 4980 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4006 ft. | | N | N | SUSSEX | 4380 ft. | | N | N | NIOBRARA | 7000 ft. | | N | N | FORT HAYS | 7227 ft. | | N | N | CODELL | 7256 ft. | | N | N | J SAND | 7706 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/2/2009 Interval Top: 7256 ft. Interval Bottom: 7272 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/8/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/3/2009 | Treatment Summary: | 167315 GALS FLUID & 115000 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7256 ft. | # Of Holes: | 64 | Interval Bottom: | 7272 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/30/2018 Interval Top: 7022 ft. Interval Bottom: 7272 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/8/2009 | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/24/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/2/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1246 | CALC_BBLS_OIL | 52 | CALC_GOR | 2347 | CALC_MCF_GAS | 122 | CASING_PRESS | 550 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7022 ft. | # Of Holes: | 128 | Interval Bottom: | 7272 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/2/2009 Interval Top: 7022 ft. Interval Bottom: 7114 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/8/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/4/2009 | Treatment Summary: | 500 GALS ACID & 238000 GALS FLUID & 200400 LBS 40/70 SAND & 4000 LBS SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7022 ft. | # Of Holes: | 64 | Interval Bottom: | 7114 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 01/30/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|