|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/27/2018 Measured TD: 7965 ft. Vertical TD: 7771 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/27/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/23/2012 | Proposed Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 661 FNL 655 FEL | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 661 FNL 655 FEL | Proposed Depth/Form: | 7965 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2NE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 855 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 540, Top: 0 ft., Bottom: 855 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7954 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 750, Top: 1184 ft., Bottom: 7954 ft. |
| | |
Wellbore Completed | Completion Date: | 7/29/2009 | Spud Date: | 7/24/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7965 ft. | Measured PB depth: | 7917 ft. | True Vertical TD: | 7771 ft. | True Vertical PB depth: | 7723 ft. | Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 661 FNL 655 FEL | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 661 FNL 655 FEL | Log Types: | P/E AILC-CNDL-ML-TC, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 855 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 540, Top: 0 ft., Bottom: 855 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7954 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 6500 ft., Bottom: 7954 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4982 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 520, Top: 1184 ft., Bottom: 5000 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4080 ft. | 4291 ft. | N | N | SUSSEX | 4378 ft. | 4710 ft. | N | N | NIOBRARA | 7028 ft. | | N | N | FORT HAYS | 7302 ft. | | N | N | CODELL | 7324 ft. | | N | N | J SAND | 7773 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 9/27/2018 Interval Top: 7784 ft. Interval Bottom: 7816 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/2/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/18/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 164,052 gal Slickwater w/ 115,040# 40/70, 4,340# SB Excel, 0# . |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7784 ft. | # Of Holes: | 38 | Interval Bottom: | 7816 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7325 ft. Interval Bottom: 7340 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/5/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/31/2009 | Treatment Summary: | 205055 GALS FLUID & 151000 LBS 20/40 SAND & 4000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7325 ft. | # Of Holes: | 60 | Interval Bottom: | 7340 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/27/2011 Interval Top: 7088 ft. Interval Bottom: 7816 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/2/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/18/2011 | Treatment Summary: | nb perf 7088-7180 holes 54 size .42
cd perf 7325-7340 holes 60 size .42
jsnd perf 7784-7816 holes 38 size .42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7741 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/27/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 8 | BTU_GAS | 1341 | CALC_BBLS_OIL | 8 | CALC_GOR | 8750 | CALC_MCF_GAS | 70 | CASING_PRESS | 996 | GRAVITY_OIL | 52 | MCF_GAS | 70 | TUBING_PRESS | 705 |
| Perforation Data: | Interval Top: | 7088 ft. | # Of Holes: | 152 | Interval Bottom: | 7816 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/27/2018 Interval Top: 7088 ft. Interval Bottom: 7340 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/5/2009 | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/29/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/11/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1246 | CALC_BBLS_OIL | 52 | CALC_GOR | 1930 | CALC_MCF_GAS | 100 | CASING_PRESS | 2850 | GRAVITY_OIL | 50 |
| Perforation Data: | Interval Top: | 7088 ft. | # Of Holes: | 114 | Interval Bottom: | 7340 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7088 ft. Interval Bottom: 7180 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/5/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/1/2009 | Treatment Summary: | 500 GALS ACID & 243657 GALS FLUID & 200400 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7088 ft. | # Of Holes: | 54 | Interval Bottom: | 7180 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 09/27/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|