|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2022 Measured TD: 7976 ft. Vertical TD: 7762 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/23/2012 | | Proposed Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 1306 FSL 2487 FWL | | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 1317 FSL 2480 FWL | | Proposed Depth/Form: | 7676 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 861 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 861 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5154 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 870, Top: 396 ft., Bottom: 5206 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5165 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 1100 ft., Bottom: 5165 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/22/2009 | | Spud Date: | 6/18/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7976 ft. | Measured PB depth: | 7929 ft. | | True Vertical TD: | 7762 ft. | True Vertical PB depth: | 7715 ft. | | Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 1306 FSL 2487 FWL | | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 1306 FSL 2487 FWL | | Log Types: | P/E AILC-CNDL-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 861 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 861 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7966 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 6420 ft., Bottom: 7966 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5154 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 396 ft., Bottom: 5206 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5154 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 390 ft., Bottom: 5206 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4123 ft. | 4350 ft. | N | N | | SUSSEX | 4531 ft. | 4762 ft. | N | N | | NIOBRARA | 7070 ft. | | N | N | | FORT HAYS | 7339 ft. | | N | N | | CODELL | 7363 ft. | | N | N | | J SAND | 7820 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 6/1/2022 Interval Top: 7826 ft. Interval Bottom: 7868 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/31/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/18/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 163,800 gal Slickwater w/ 115,140# 40/70, 4,060# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7826 ft. | # Of Holes: | 54 | | Interval Bottom: | 7868 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7364 ft. Interval Bottom: 7380 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/26/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/25/2009 | | Treatment Summary: | 171831 GALS FLUID & 116700 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7364 ft. | # Of Holes: | 64 | | Interval Bottom: | 7380 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/28/2011 Interval Top: 7132 ft. Interval Bottom: 7868 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/31/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/18/2011 | | Treatment Summary: | NB PERF 7132-7236 HOLES 60 SIZE .42
CD PERF 7364-7380 HOLES 64 SIZE .40
JSND PERF 7826-7868 HOLES 54 SIZE 0.38 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7796 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1388 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 9250 | | CALC_MCF_GAS | 74 | | CASING_PRESS | 1024 | | GRAVITY_OIL | 51 | | MCF_GAS | 74 | | TUBING_PRESS | 672 |
| | Perforation Data: | | Interval Top: | 7132 ft. | # Of Holes: | 178 | | Interval Bottom: | 7868 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 6/1/2022 Interval Top: 7132 ft. Interval Bottom: 7380 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/26/2009 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/22/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/13/2009 | Test Method: | FLKOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1273 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 1483 | | CALC_MCF_GAS | 86 | | CASING_PRESS | 700 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7132 ft. | # Of Holes: | 124 | | Interval Bottom: | 7380 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7123 ft. Interval Bottom: 7236 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/26/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/26/2009 | | Treatment Summary: | 229080 GALS FLUID & 153520 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7123 ft. | # Of Holes: | 60 | | Interval Bottom: | 7236 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 05/31/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|