|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2022 Measured TD: 7877 ft. Vertical TD: 7760 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20091632 | Expiration Date: | 5/6/2010 | | Proposed Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 669 FSL 1977 FWL | | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 669 FSL 1977 FWL | | Proposed Depth/Form: | 7872 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SW |
| | |
| Wellbore Completed | | Completion Date: | 6/11/2009 | | Spud Date: | 6/7/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7877 ft. | Measured PB depth: | 7829 ft. | | True Vertical TD: | 7760 ft. | True Vertical PB depth: | 7713 ft. | | Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 669 FSL 1977 FWL | | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 669 FSL 1977 FWL | | Log Types: | P/E AILC-CNLD-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 865 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 865 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7867 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 6390 ft., Bottom: 7867 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5200 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 968 ft., Bottom: 5250 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4113 ft. | 4196 ft. | N | N | | SUSSEX | 4364 ft. | 4658 ft. | N | N | | NIOBRARA | 6975 ft. | | N | N | | FORT HAYS | 7247 ft. | | N | N | | CODELL | 7270 ft. | | N | N | | J SAND | 7727 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7270 ft. Interval Bottom: 7286 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/22/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/11/2009 | | Treatment Summary: | 182,266 GALS FLUID & 116,040# 40/70 SAND & 4,000# 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7270 ft. | # Of Holes: | 64 | | Interval Bottom: | 7286 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 6/1/2022 Interval Top: 7040 ft. Interval Bottom: 7286 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/22/2009 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/11/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1273 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 53 | | CALC_GOR | 1321 | | CALC_MCF_GAS | 70 | | CASING_PRESS | 725 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7040 ft. | # Of Holes: | 124 | | Interval Bottom: | 7286 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7040 ft. Interval Bottom: 7130 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/22/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/12/2009 | | Treatment Summary: | 222,359 GALS FLUID & 156,750# 40/70 SAND & 4,000# SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7040 ft. | # Of Holes: | 60 | | Interval Bottom: | 7130 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 05/31/2022 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|