|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/17/2017 Measured TD: 7930 ft. Vertical TD: 7774 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/17/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20091522 | Expiration Date: | 5/4/2010 | | Proposed Top PZ Location: | Sec:33 Twp: 3N 68W | Footage: 1988 FSL 670 FEL | | Bottom Hole Location: | Sec:33 Twp: 3N 68W | Footage: 1988 FSL 670 FEL | | Proposed Depth/Form: | 8001 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SE |
| | |
| Wellbore Completed | | Completion Date: | 9/29/2009 | | Spud Date: | 9/25/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7930 ft. | Measured PB depth: | 7919 ft. | | True Vertical TD: | 7774 ft. | True Vertical PB depth: | 7763 ft. | | Top PZ Location: | Sec:33 Twp: 3N 68W | Footage: 1988 FSL 670 FEL | | Bottom Hole Location: | Sec:33 Twp: 3N 68W | Footage: 1988 FSL 670 FEL | | Log Types: | P/E AILC-CNDL-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 928 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7919 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 6396 ft., Bottom: 7919 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5044 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 1250 ft., Bottom: 5060 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3603 ft. | 3694 ft. | N | N | | SUSSEX | 4086 ft. | 4374 ft. | N | N | | SHANNON | 4617 ft. | 4700 ft. | N | N | | NIOBRARA | 7056 ft. | | N | N | | FORT HAYS | 7325 ft. | | N | N | | CODELL | 7344 ft. | | N | N | | J SAND | 7773 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/29/2010 Interval Top: 7349 ft. Interval Bottom: 7367 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/12/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/2009 | | Treatment Summary: | 197,655 GALS FLUID & 150,980 LBS 40/70 SAND 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7349 ft. | # Of Holes: | 54 | | Interval Bottom: | 7367 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/17/2017 Interval Top: 7075 ft. Interval Bottom: 7367 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/12/2010 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/10/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/29/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1473 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 66 | | CALC_GOR | 3152 | | CALC_MCF_GAS | 208 | | CASING_PRESS | 2000 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7075 ft. | # Of Holes: | 118 | | Interval Bottom: | 7367 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/29/2010 Interval Top: 7075 ft. Interval Bottom: 7224 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/12/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/10/2009 | | Treatment Summary: | 500 GALS ACID & 239,959 GALS FLUID & 200,660 LBS 40/70 SAND & 4,000 LS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7075 ft. | # Of Holes: | 64 | | Interval Bottom: | 7224 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/17/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|