|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/3/2021 Measured TD: 8270 ft. Vertical TD: 8146 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/3/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/7/2013 | | Proposed Top PZ Location: | Sec:30 Twp: 2N 68W | Footage: 2132 FNL 487 FWL | | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 2132 FNL 487 FWL | | Proposed Depth/Form: | 8270 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 335, Top: 0 ft., Bottom: 880 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 223, Top: 6390 ft., Bottom: 8264 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5350 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 540, Top: 1370 ft., Bottom: 5484 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/18/2009 | | Spud Date: | 8/14/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8270 ft. | Measured PB depth: | 8245 ft. | | True Vertical TD: | 8146 ft. | True Vertical PB depth: | 8121 ft. | | Top PZ Location: | Sec:30 Twp: 2N 68W | Footage: 2132 FNL 487 FWL | | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 2132 FNL 487 FWL | | Log Types: | CD-CN-ML, DI-GL-GR,CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 0 ft., Bottom: 880 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 223, Top: 6650 ft., Bottom: 8264 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5351 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5351 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 1360 ft., Bottom: 5450 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3864 ft. | | N | N | | SUSSEX | 4460 ft. | | N | N | | SHANNON | 4898 ft. | | N | N | | NIOBRARA | 7390 ft. | | N | N | | FORT HAYS | 7668 ft. | | N | N | | CODELL | 7687 ft. | | N | N | | J SAND | 8100 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 12/9/2021 Interval Top: 8126 ft. Interval Bottom: 8148 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/19/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/2/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 161,398 gal Slickwater w/ 159,260# 40/70, 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8126 ft. | # Of Holes: | 66 | | Interval Bottom: | 8148 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/13/2011 Interval Top: 7688 ft. Interval Bottom: 7708 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/27/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2009 | | Treatment Summary: | 209,687 GALS FLUID & 150,080 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7688 ft. | # Of Holes: | 60 | | Interval Bottom: | 7708 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/8/2011 Interval Top: 7391 ft. Interval Bottom: 8148 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/19/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/2/2011 | | Treatment Summary: | JSND REC |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8104 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/8/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 11 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 6364 | | CALC_MCF_GAS | 70 | | CASING_PRESS | 920 | | GRAVITY_OIL | 51 | | MCF_GAS | 70 | | TUBING_PRESS | 755 |
| | Perforation Data: | | Interval Top: | 7391 ft. | # Of Holes: | 198 | | Interval Bottom: | 8148 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/9/2021 Interval Top: 7391 ft. Interval Bottom: 7708 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/27/2009 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/9/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1174 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 59 | | CALC_GOR | 2712 | | CALC_MCF_GAS | 160 | | CASING_PRESS | 1250 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7391 ft. | # Of Holes: | 132 | | Interval Bottom: | 7708 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/13/2011 Interval Top: 7391 ft. Interval Bottom: 7574 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/27/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/2009 | | Treatment Summary: | 245,699 GALS FLUID & 200,060 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7391 ft. | # Of Holes: | 72 | | Interval Bottom: | 7574 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/09/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|