Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2024 Measured TD: 8120 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2024 | | Wellbore Permit | | | Permit #: | 20091315 | Expiration Date: | 4/22/2010 | | Proposed Depth/Form: | 8104 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: N2NE4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5394 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4377 ft., Bottom: 5394 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/26/2010 | | Spud Date: | 3/20/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8120 ft. | Measured PB depth: | 8063 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1057 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 1057 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8112 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 3824 ft., Bottom: 8112 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4622 ft. | | N | N | | NIOBRARA | 7198 ft. | | N | N | | CODELL | 7492 ft. | | N | N | | J SAND | 7940 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 4/1/2024 Interval Top: 7940 ft. Interval Bottom: 7970 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/30/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 250,200# 20/40 SAND. 03/30/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7940 ft. | # Of Holes: | 36 | | Interval Bottom: | 7970 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/28/2010 Interval Top: 7266 ft. Interval Bottom: 7970 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/11/2010 | | Treatment Summary: | SET CFP @ 7150'. 04-06-10. DRILLED OUT CFPS TO COMMINGLE THE JSND-NBRR-CDL. 04/07/10. | | Formation Treatment | | Treatment Date: | 4/7/2010 | | Treatment Summary: | JSND-NB-CD COMMINGLE. SET CFP@7150' 4/06/10. DRILLED OUT CFP'S TO COMMINGLE JSND-NB-CD 4/7/10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7918 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/11/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 109 | | BBLS_OIL | 69 | | BTU_GAS | 1206 | | CALC_BBLS_H2O | 109 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 4870 | | CALC_MCF_GAS | 336 | | CASING_PRESS | 1746 | | GRAVITY_OIL | 46 | | MCF_GAS | 336 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 7266 ft. | # Of Holes: | 152 | | Interval Bottom: | 7970 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 4/1/2024 Interval Top: 7266 ft. Interval Bottom: 7510 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/30/2010 | | Treatment Summary: | NBRR-CDL COMPLETION. SET CFP @ 7550'. 03/30/2010. FRAC'D THE CODELL WITH 250,420# FRAC SAND. 03/30/2010. SET CFP @ 7350'. 03/30/2010. FRAC'D THE NIOBRARA WITH 250,460# 20/40 FRAC SAND. 03/30/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7266 ft. | # Of Holes: | 116 | | Interval Bottom: | 7510 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 259 |
| Total Gas Produced (MCF) | 7092 |
| GOR | 27382 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.072 |
| Average MCFE per Day | 23.626 |
| Federal Financial Assurance | i | |
|
|